{"title":"场地和项目经理的活动分析——从创造价值的角度看的启示","authors":"M. Binninger, J. Dlouhy, Johannes Schneider, Shervin Haghsheno","doi":"10.24928/2018/0315","DOIUrl":null,"url":null,"abstract":"Construction projects are complex and include various processes, which have to be managed by a construction team. The position of a site manager or project manager (below we will use the term construction manager (CM)) plays an important role for the success of projects, because this position has the responsibility for the process organisation within the project. Studies show construction managers are typically exposed to a high level of stress. One German study from 1997 shows clearly the degree and effects of a high stress level. A major factor for inefficiency and a catalyst for stress could be a lack of transparency and missing communication inside a construction team. The paper describes the results of a study of the daily activities of construction managers. Six individuals were accompanied and interviewed. In total 55 hours of observation have been undertaken to analyse the daily routine at this organisational level in projects. Based on the results of this analysis the authors propose improvements for construction managers. The proposal is based on the idea to structure the daily work routine of a construction manager. This helps to reduce the frequent changes and interruptions in activities, so construction managers can concentrate on value creating activities.","PeriodicalId":419313,"journal":{"name":"26th Annual Conference of the International Group for Lean Construction","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Analysis of the Activities of Site and Project Managers – Implications From the Perspective of Creating Value\",\"authors\":\"M. Binninger, J. Dlouhy, Johannes Schneider, Shervin Haghsheno\",\"doi\":\"10.24928/2018/0315\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction projects are complex and include various processes, which have to be managed by a construction team. The position of a site manager or project manager (below we will use the term construction manager (CM)) plays an important role for the success of projects, because this position has the responsibility for the process organisation within the project. Studies show construction managers are typically exposed to a high level of stress. One German study from 1997 shows clearly the degree and effects of a high stress level. A major factor for inefficiency and a catalyst for stress could be a lack of transparency and missing communication inside a construction team. The paper describes the results of a study of the daily activities of construction managers. Six individuals were accompanied and interviewed. In total 55 hours of observation have been undertaken to analyse the daily routine at this organisational level in projects. Based on the results of this analysis the authors propose improvements for construction managers. The proposal is based on the idea to structure the daily work routine of a construction manager. This helps to reduce the frequent changes and interruptions in activities, so construction managers can concentrate on value creating activities.\",\"PeriodicalId\":419313,\"journal\":{\"name\":\"26th Annual Conference of the International Group for Lean Construction\",\"volume\":\"36 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-07-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"26th Annual Conference of the International Group for Lean Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24928/2018/0315\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"26th Annual Conference of the International Group for Lean Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2018/0315","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

建筑项目是复杂的,包括各种各样的过程,必须由一个施工团队来管理。现场经理或项目经理(下面我们将使用术语施工经理(CM))的职位对项目的成功起着重要作用,因为这个职位负责项目中的过程组织。研究表明,施工经理通常承受着很高的压力。1997年德国的一项研究清楚地显示了高压力水平的程度和影响。造成效率低下和压力的一个主要因素可能是施工团队内部缺乏透明度和缺乏沟通。本文描述了对施工经理日常活动的研究结果。有六个人陪同并接受了采访。总共进行了55个小时的观察,以分析项目中这个组织层面的日常工作。根据分析结果,作者提出了施工管理人员的改进建议。该提案基于构建施工经理日常工作的想法。这有助于减少活动中的频繁变化和中断,因此施工经理可以集中精力于创造价值的活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of the Activities of Site and Project Managers – Implications From the Perspective of Creating Value
Construction projects are complex and include various processes, which have to be managed by a construction team. The position of a site manager or project manager (below we will use the term construction manager (CM)) plays an important role for the success of projects, because this position has the responsibility for the process organisation within the project. Studies show construction managers are typically exposed to a high level of stress. One German study from 1997 shows clearly the degree and effects of a high stress level. A major factor for inefficiency and a catalyst for stress could be a lack of transparency and missing communication inside a construction team. The paper describes the results of a study of the daily activities of construction managers. Six individuals were accompanied and interviewed. In total 55 hours of observation have been undertaken to analyse the daily routine at this organisational level in projects. Based on the results of this analysis the authors propose improvements for construction managers. The proposal is based on the idea to structure the daily work routine of a construction manager. This helps to reduce the frequent changes and interruptions in activities, so construction managers can concentrate on value creating activities.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信