分析了timorleste Eto Tower帝力建筑工程进展的描述性分析

Analisa Deskriptif, Keterlambatan Pekerjaan, Proyek Konstruksi, I. Komang, Agus Ariana, Dewa Ayu, Putu Adhiya, Garini Putri, Messias Da Costa Boavida, Kata Kunci, Keterlambatan Proyek
{"title":"分析了timorleste Eto Tower帝力建筑工程进展的描述性分析","authors":"Analisa Deskriptif, Keterlambatan Pekerjaan, Proyek Konstruksi, I. Komang, Agus Ariana, Dewa Ayu, Putu Adhiya, Garini Putri, Messias Da Costa Boavida, Kata Kunci, Keterlambatan Proyek","doi":"10.38043/telsinas.v5i2.4111","DOIUrl":null,"url":null,"abstract":"In general, every implementation of a construction project there is always a work delay. The delay in this work has an impact on the implementation of the Eto Tower construction project in Dili, Timor-Leste which will be carried out in January 2020 to January 2021, but has been delayed. Thus, the purpose of this study is to describe what causes delays in the Eto Tower construction project. Descriptive statistical analysis was used in this study. Where the number of samples is 33 employees which is the entire population. The results of this study indicate that the main causes that affect the delay in the Eto Tower construction project are environmental factors with a mean value of 27.24, lack of materials and materials with a mean value of 26.85 and the cause of equipment with a mean value of 26.67. Support from the local community in the project is needed.","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisa Deskriptif Keterlambatan Pekerjaan Proyek Konstruksi Eto Tower Dili, Timor-Leste\",\"authors\":\"Analisa Deskriptif, Keterlambatan Pekerjaan, Proyek Konstruksi, I. Komang, Agus Ariana, Dewa Ayu, Putu Adhiya, Garini Putri, Messias Da Costa Boavida, Kata Kunci, Keterlambatan Proyek\",\"doi\":\"10.38043/telsinas.v5i2.4111\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In general, every implementation of a construction project there is always a work delay. The delay in this work has an impact on the implementation of the Eto Tower construction project in Dili, Timor-Leste which will be carried out in January 2020 to January 2021, but has been delayed. Thus, the purpose of this study is to describe what causes delays in the Eto Tower construction project. Descriptive statistical analysis was used in this study. Where the number of samples is 33 employees which is the entire population. The results of this study indicate that the main causes that affect the delay in the Eto Tower construction project are environmental factors with a mean value of 27.24, lack of materials and materials with a mean value of 26.85 and the cause of equipment with a mean value of 26.67. Support from the local community in the project is needed.\",\"PeriodicalId\":252670,\"journal\":{\"name\":\"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.38043/telsinas.v5i2.4111\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.38043/telsinas.v5i2.4111","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

一般来说,每一个建设项目的实施总会有一个工作延误。这项工作的延误对东帝汶帝力Eto塔建设项目的实施产生了影响,该项目将于2020年1月至2021年1月进行,但已被推迟。因此,本研究的目的是描述造成江东塔建设项目延误的原因。本研究采用描述性统计分析。样本数是33名员工,也就是总体。研究结果表明,影响江东塔建设项目延误的主要原因是环境因素(平均值为27.24)、材料和材料缺乏(平均值为26.85)和设备原因(平均值为26.67)。该项目需要当地社区的支持。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analisa Deskriptif Keterlambatan Pekerjaan Proyek Konstruksi Eto Tower Dili, Timor-Leste
In general, every implementation of a construction project there is always a work delay. The delay in this work has an impact on the implementation of the Eto Tower construction project in Dili, Timor-Leste which will be carried out in January 2020 to January 2021, but has been delayed. Thus, the purpose of this study is to describe what causes delays in the Eto Tower construction project. Descriptive statistical analysis was used in this study. Where the number of samples is 33 employees which is the entire population. The results of this study indicate that the main causes that affect the delay in the Eto Tower construction project are environmental factors with a mean value of 27.24, lack of materials and materials with a mean value of 26.85 and the cause of equipment with a mean value of 26.67. Support from the local community in the project is needed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信