砂拉越建筑工程工期的决定因素

A. M. Kamaruddeen, Yap Wan Keat, Ibrahim Jibrin Abubakar
{"title":"砂拉越建筑工程工期的决定因素","authors":"A. M. Kamaruddeen, Yap Wan Keat, Ibrahim Jibrin Abubakar","doi":"10.35370/bjssh.2019.1.1-05","DOIUrl":null,"url":null,"abstract":"This research utilized the quantitative method and stratified simple random sampling technique to collect data with a view to investigating the determinants of construction duration of building projects in Sarawak. Out of the 180 copies of questionnaire distributed to grade 4, 5, 6 and 7 contractors operating within Bintulu and Sibu in Sarawak, only 36 copies were duly completed, making the valid response rate to be 20 percent. Descriptive analysis and Relative Importance Index (RII) were utilized in analysing the data. The descriptive analysis revealed that availability of construction site, type of building constructed and market condition are the important determinants of construction duration. The result of relative importance index revealed that the availability of construction site is the highest determinant. This study has complemented the existing knowledge on the determinants of construction duration.","PeriodicalId":173200,"journal":{"name":"Borneo Journal of Social Sciences and Humanities","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Construction Duration Determinants of Building Projects in Sarawak\",\"authors\":\"A. M. Kamaruddeen, Yap Wan Keat, Ibrahim Jibrin Abubakar\",\"doi\":\"10.35370/bjssh.2019.1.1-05\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This research utilized the quantitative method and stratified simple random sampling technique to collect data with a view to investigating the determinants of construction duration of building projects in Sarawak. Out of the 180 copies of questionnaire distributed to grade 4, 5, 6 and 7 contractors operating within Bintulu and Sibu in Sarawak, only 36 copies were duly completed, making the valid response rate to be 20 percent. Descriptive analysis and Relative Importance Index (RII) were utilized in analysing the data. The descriptive analysis revealed that availability of construction site, type of building constructed and market condition are the important determinants of construction duration. The result of relative importance index revealed that the availability of construction site is the highest determinant. This study has complemented the existing knowledge on the determinants of construction duration.\",\"PeriodicalId\":173200,\"journal\":{\"name\":\"Borneo Journal of Social Sciences and Humanities\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Borneo Journal of Social Sciences and Humanities\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35370/bjssh.2019.1.1-05\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Borneo Journal of Social Sciences and Humanities","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35370/bjssh.2019.1.1-05","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究利用定量方法和分层简单随机抽样技术来收集数据,以调查砂拉越建筑项目建设工期的决定因素。在沙捞越州的民都鲁和西武,向4、5、6和7级承包商分发了180份问卷,其中只有36份按时完成,有效回复率为20%。采用描述性分析和相对重要性指数(RII)对数据进行分析。描述性分析表明,建筑场地的可用性、建筑类型和市场条件是建筑工期的重要决定因素。相对重要性指数的结果表明,建筑场地的可获得性是最大的决定因素。本研究补充了现有的关于施工工期决定因素的知识。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Construction Duration Determinants of Building Projects in Sarawak
This research utilized the quantitative method and stratified simple random sampling technique to collect data with a view to investigating the determinants of construction duration of building projects in Sarawak. Out of the 180 copies of questionnaire distributed to grade 4, 5, 6 and 7 contractors operating within Bintulu and Sibu in Sarawak, only 36 copies were duly completed, making the valid response rate to be 20 percent. Descriptive analysis and Relative Importance Index (RII) were utilized in analysing the data. The descriptive analysis revealed that availability of construction site, type of building constructed and market condition are the important determinants of construction duration. The result of relative importance index revealed that the availability of construction site is the highest determinant. This study has complemented the existing knowledge on the determinants of construction duration.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信