{"title":"海底生产系统初始启动的计划和程序","authors":"H. Duhon, J. Garduno, Noel R. Robinson","doi":"10.2118/123790-PA","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":335535,"journal":{"name":"Spe Projects Facilities & Construction","volume":"121 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Planning and Procedures for the Initial Startup of Subsea Production Systems\",\"authors\":\"H. Duhon, J. Garduno, Noel R. Robinson\",\"doi\":\"10.2118/123790-PA\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":335535,\"journal\":{\"name\":\"Spe Projects Facilities & Construction\",\"volume\":\"121 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Spe Projects Facilities & Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/123790-PA\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Projects Facilities & Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/123790-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}