{"title":"电镀机时程图的演化设计","authors":"Georges E. Matile, A. Tettamanzi, M. Tomassini","doi":"10.1109/CEC.1999.782557","DOIUrl":null,"url":null,"abstract":"Scheduling the production for plating machines is a tedious and difficult task of critical importance for the economic exploitation of this equipment. The paper describes a promising approach to solving a simple version of this problem, namely cyclical hoist scheduling, based on evolutionary algorithms. The issues of solution encoding and specialised genetic operators are discussed and some preliminary results are presented.","PeriodicalId":292523,"journal":{"name":"Proceedings of the 1999 Congress on Evolutionary Computation-CEC99 (Cat. No. 99TH8406)","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Evolutionary design of time-way charts for plating machines\",\"authors\":\"Georges E. Matile, A. Tettamanzi, M. Tomassini\",\"doi\":\"10.1109/CEC.1999.782557\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Scheduling the production for plating machines is a tedious and difficult task of critical importance for the economic exploitation of this equipment. The paper describes a promising approach to solving a simple version of this problem, namely cyclical hoist scheduling, based on evolutionary algorithms. The issues of solution encoding and specialised genetic operators are discussed and some preliminary results are presented.\",\"PeriodicalId\":292523,\"journal\":{\"name\":\"Proceedings of the 1999 Congress on Evolutionary Computation-CEC99 (Cat. No. 99TH8406)\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-07-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 1999 Congress on Evolutionary Computation-CEC99 (Cat. No. 99TH8406)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CEC.1999.782557\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1999 Congress on Evolutionary Computation-CEC99 (Cat. No. 99TH8406)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CEC.1999.782557","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Evolutionary design of time-way charts for plating machines
Scheduling the production for plating machines is a tedious and difficult task of critical importance for the economic exploitation of this equipment. The paper describes a promising approach to solving a simple version of this problem, namely cyclical hoist scheduling, based on evolutionary algorithms. The issues of solution encoding and specialised genetic operators are discussed and some preliminary results are presented.