{"title":"Långströmmen大坝安全最佳实践项目,一个额外的新的泄洪道,一个紧急放射形闸门和2.5公里的土填坝扩建","authors":"P. Kotrba, C. Sjöberg, P. Bylander","doi":"10.1201/9780429319778-163","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":365954,"journal":{"name":"Sustainable and Safe Dams Around the World","volume":"05 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Långströmmen Dam Safety—best practice project, an additional new spillway with an emergency radial gate and 2.5 km earth-fill dam enlargement\",\"authors\":\"P. Kotrba, C. Sjöberg, P. Bylander\",\"doi\":\"10.1201/9780429319778-163\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":365954,\"journal\":{\"name\":\"Sustainable and Safe Dams Around the World\",\"volume\":\"05 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-08-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Sustainable and Safe Dams Around the World\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1201/9780429319778-163\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sustainable and Safe Dams Around the World","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1201/9780429319778-163","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}