{"title":"Debit Banjir Rancangan DAS Selabung dengan HSS Nakayasu","authors":"Reni Andayani, Zuul Fitriana Umari","doi":"10.31851/deformasi.v7i1.7803","DOIUrl":null,"url":null,"abstract":"Knowledge and analysis about flood discharge in Selabung watershed is used as spillway planning. Selabung watershed with Selabung River as the main river and 71.29 km long. Flood’s controlling in spillway is needed especially when water level almost reachers the maximum discharge. The purpose of this study was to determine the design flood discharge in Selabung watershed for the 100 year return period. The primary data in this study is morphological observation data and the secondary datas are rainfall data from 2001 to 2014, topographic data, land use, and river cross-section data. The calculation of rainfall average for three rain stations used Poligon Thiessen method. From the calculation of design flood discharge for 100-year return period using The Nakayasu Synthetic Unit Hydrograph, the discharge is 36.89 / s.","PeriodicalId":403329,"journal":{"name":"Jurnal Deformasi","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Deformasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31851/deformasi.v7i1.7803","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

利用对Selabung流域洪流量的了解和分析,进行溢洪道规划。Selabung流域以Selabung河为主要河流,长71.29公里。特别是当水位接近最大流量时,需要对溢洪道进行防洪控制。本研究的目的是确定西拉邦流域100年重现期的设计洪流量。本研究的主要数据是地貌观测数据,次要数据是2001 - 2014年的降雨数据、地形数据、土地利用数据和河流断面数据。采用Poligon - Thiessen法计算三个雨站的平均降雨量。利用中山综合单元线计算百年复发期设计洪流量为36.89 / s。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Debit Banjir Rancangan DAS Selabung dengan HSS Nakayasu
Knowledge and analysis about flood discharge in Selabung watershed is used as spillway planning. Selabung watershed with Selabung River as the main river and 71.29 km long. Flood’s controlling in spillway is needed especially when water level almost reachers the maximum discharge. The purpose of this study was to determine the design flood discharge in Selabung watershed for the 100 year return period. The primary data in this study is morphological observation data and the secondary datas are rainfall data from 2001 to 2014, topographic data, land use, and river cross-section data. The calculation of rainfall average for three rain stations used Poligon Thiessen method. From the calculation of design flood discharge for 100-year return period using The Nakayasu Synthetic Unit Hydrograph, the discharge is 36.89 / s.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信