基于Primavera软件的核电大修多项目管理解决方案

Yanhua Wu, Shushun Lin, Zheng Zhang
{"title":"基于Primavera软件的核电大修多项目管理解决方案","authors":"Yanhua Wu, Shushun Lin, Zheng Zhang","doi":"10.1109/IBICA.2011.71","DOIUrl":null,"url":null,"abstract":"We analyze the application problems of the Primavera software in the overhaul schedule management of nuclear power plant firstly, and then elaborate the research program of nuclear power overhaul multi-project management based on Primavera software in order to address these issues. In this paper, we focus on the implementation of nuclear power overhaul schedule management assistant system based on Primavera software as well as the main components of the system. What's more, we demonstrate the business process of the total solution by the application examples. Finally, we illustrate the program has a good reference and promotion of significance for the domestic nuclear power industry overhaul.","PeriodicalId":158080,"journal":{"name":"2011 Second International Conference on Innovations in Bio-inspired Computing and Applications","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Solution of Nuclear Power Overhaul Multi-project Management Based on Primavera Software\",\"authors\":\"Yanhua Wu, Shushun Lin, Zheng Zhang\",\"doi\":\"10.1109/IBICA.2011.71\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We analyze the application problems of the Primavera software in the overhaul schedule management of nuclear power plant firstly, and then elaborate the research program of nuclear power overhaul multi-project management based on Primavera software in order to address these issues. In this paper, we focus on the implementation of nuclear power overhaul schedule management assistant system based on Primavera software as well as the main components of the system. What's more, we demonstrate the business process of the total solution by the application examples. Finally, we illustrate the program has a good reference and promotion of significance for the domestic nuclear power industry overhaul.\",\"PeriodicalId\":158080,\"journal\":{\"name\":\"2011 Second International Conference on Innovations in Bio-inspired Computing and Applications\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-12-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 Second International Conference on Innovations in Bio-inspired Computing and Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IBICA.2011.71\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 Second International Conference on Innovations in Bio-inspired Computing and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IBICA.2011.71","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文首先分析了Primavera软件在核电站大修计划管理中的应用问题,然后针对这些问题,阐述了基于Primavera软件的核电大修多项目管理的研究方案。本文重点介绍了基于Primavera软件的核电大修计划管理辅助系统的实现以及系统的主要组成部分。并通过应用程序示例演示了整个解决方案的业务流程。最后,说明该方案对国内核电工业大修具有很好的借鉴和推广意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Solution of Nuclear Power Overhaul Multi-project Management Based on Primavera Software
We analyze the application problems of the Primavera software in the overhaul schedule management of nuclear power plant firstly, and then elaborate the research program of nuclear power overhaul multi-project management based on Primavera software in order to address these issues. In this paper, we focus on the implementation of nuclear power overhaul schedule management assistant system based on Primavera software as well as the main components of the system. What's more, we demonstrate the business process of the total solution by the application examples. Finally, we illustrate the program has a good reference and promotion of significance for the domestic nuclear power industry overhaul.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信