可操作性和可维护性障碍:一种探索性因素分析方法

Nazanin Kordestani Ghalenoei, Ehsan Saghatforoush, Ahad Zareravasan
{"title":"可操作性和可维护性障碍:一种探索性因素分析方法","authors":"Nazanin Kordestani Ghalenoei, Ehsan Saghatforoush, Ahad Zareravasan","doi":"10.1504/IJAOM.2021.113666","DOIUrl":null,"url":null,"abstract":"As the population grows, more infrastructure projects are required too for economic growth of countries however, their maintenance becomes more significant after the completion. It is essential to pay especial attention to the operation and maintenance (O&M) to sustain the value of invested budget. Proper O&M implementation has however experienced some obstacles and an initial step in resolving them is to identify them. This paper aims to identify and prioritise the O&M implementation obstacles in infrastructure projects in Iran. A comprehensive list of obstacles is prepared through a deep literature review and then used of a questionnaire survey. The gathered data from the questionnaires were analysed using the robust exploratory factor analysis method. Twenty-three obstacles are categorised under six themes of management, structure, culture, education and learning, communication, and finance. Results show that management obstacles should be considered in priority for such infrastructure projects, and by solving them.","PeriodicalId":191561,"journal":{"name":"Int. J. Adv. Oper. Manag.","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Operability and maintainability obstacles: an exploratory factor analysis approach\",\"authors\":\"Nazanin Kordestani Ghalenoei, Ehsan Saghatforoush, Ahad Zareravasan\",\"doi\":\"10.1504/IJAOM.2021.113666\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As the population grows, more infrastructure projects are required too for economic growth of countries however, their maintenance becomes more significant after the completion. It is essential to pay especial attention to the operation and maintenance (O&M) to sustain the value of invested budget. Proper O&M implementation has however experienced some obstacles and an initial step in resolving them is to identify them. This paper aims to identify and prioritise the O&M implementation obstacles in infrastructure projects in Iran. A comprehensive list of obstacles is prepared through a deep literature review and then used of a questionnaire survey. The gathered data from the questionnaires were analysed using the robust exploratory factor analysis method. Twenty-three obstacles are categorised under six themes of management, structure, culture, education and learning, communication, and finance. Results show that management obstacles should be considered in priority for such infrastructure projects, and by solving them.\",\"PeriodicalId\":191561,\"journal\":{\"name\":\"Int. J. Adv. Oper. Manag.\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-03-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Int. J. Adv. Oper. Manag.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJAOM.2021.113666\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Adv. Oper. Manag.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJAOM.2021.113666","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

随着人口的增长,各国的经济增长也需要更多的基础设施项目,但这些项目完成后的维护变得更加重要。为了保证投资预算的价值,必须特别注意运维工作。然而,正确的运维实现遇到了一些障碍,解决这些障碍的第一步是识别它们。本文旨在确定伊朗基础设施项目的运维实施障碍并确定其优先级。通过深入的文献综述,准备了一个全面的障碍清单,然后使用问卷调查。采用稳健的探索性因子分析法对问卷收集的数据进行分析。在管理、结构、文化、教育与学习、沟通、金融等6个主题下,共有23个障碍。结果表明,此类基础设施项目应优先考虑管理障碍,并通过解决这些障碍。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Operability and maintainability obstacles: an exploratory factor analysis approach
As the population grows, more infrastructure projects are required too for economic growth of countries however, their maintenance becomes more significant after the completion. It is essential to pay especial attention to the operation and maintenance (O&M) to sustain the value of invested budget. Proper O&M implementation has however experienced some obstacles and an initial step in resolving them is to identify them. This paper aims to identify and prioritise the O&M implementation obstacles in infrastructure projects in Iran. A comprehensive list of obstacles is prepared through a deep literature review and then used of a questionnaire survey. The gathered data from the questionnaires were analysed using the robust exploratory factor analysis method. Twenty-three obstacles are categorised under six themes of management, structure, culture, education and learning, communication, and finance. Results show that management obstacles should be considered in priority for such infrastructure projects, and by solving them.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信