{"title":"调度问题语言","authors":"Mikko Levanto","doi":"10.1109/EMWRTS.1995.514292","DOIUrl":null,"url":null,"abstract":"A language for specification of the details of a scheduling problem is presented. First experiments indicate that the language can be used to express actual scheduling problems. Some deficiencies were detected but they can be fixed while keeping the general structure of the language.","PeriodicalId":156501,"journal":{"name":"Proceedings Seventh Euromicro Workshop on Real-Time Systems","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A scheduling problem language\",\"authors\":\"Mikko Levanto\",\"doi\":\"10.1109/EMWRTS.1995.514292\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A language for specification of the details of a scheduling problem is presented. First experiments indicate that the language can be used to express actual scheduling problems. Some deficiencies were detected but they can be fixed while keeping the general structure of the language.\",\"PeriodicalId\":156501,\"journal\":{\"name\":\"Proceedings Seventh Euromicro Workshop on Real-Time Systems\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-06-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings Seventh Euromicro Workshop on Real-Time Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EMWRTS.1995.514292\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings Seventh Euromicro Workshop on Real-Time Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EMWRTS.1995.514292","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A language for specification of the details of a scheduling problem is presented. First experiments indicate that the language can be used to express actual scheduling problems. Some deficiencies were detected but they can be fixed while keeping the general structure of the language.