公共投资的可行性分析:以水库为例

.. Sardi, B. Sumbodo, Yavida Nurim, H. Hasthoro
{"title":"公共投资的可行性分析:以水库为例","authors":".. Sardi, B. Sumbodo, Yavida Nurim, H. Hasthoro","doi":"10.5220/0009877700480053","DOIUrl":null,"url":null,"abstract":": Farmers need water urgently, especially in District of Gunungkidul, because their farm’s irrigation depend on rainfall. It is not a lucky condition. They face drought in dry season, but rudundant water is in rainy season. Moreover, their area covered by water significantly. Therefore, irrigation management is urgent for the local government, such as build a reservoir for providing water supply constantly. This study aims to perform feasibility analysis approach, namely net present value, benefit cost ratio, and internal return rate. This study also implement sensivity analysis through different schema of interest rate. Prior research has implemented economic analysis to examine public investment, but in this case, the reservoir’s project has to release communities’ land and communities’ vegetation. This study reveals that the project of Embung Kedung Poh is eligible to execute and this result contributes to reseach about public investment that have to sacrifice private land and vegetation.","PeriodicalId":135180,"journal":{"name":"Proceedings of the 2nd International Conference on Applied Science, Engineering and Social Sciences","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Feasebility Analysis of Public Investment: Evidence of Reservoir\",\"authors\":\".. Sardi, B. Sumbodo, Yavida Nurim, H. Hasthoro\",\"doi\":\"10.5220/0009877700480053\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": Farmers need water urgently, especially in District of Gunungkidul, because their farm’s irrigation depend on rainfall. It is not a lucky condition. They face drought in dry season, but rudundant water is in rainy season. Moreover, their area covered by water significantly. Therefore, irrigation management is urgent for the local government, such as build a reservoir for providing water supply constantly. This study aims to perform feasibility analysis approach, namely net present value, benefit cost ratio, and internal return rate. This study also implement sensivity analysis through different schema of interest rate. Prior research has implemented economic analysis to examine public investment, but in this case, the reservoir’s project has to release communities’ land and communities’ vegetation. This study reveals that the project of Embung Kedung Poh is eligible to execute and this result contributes to reseach about public investment that have to sacrifice private land and vegetation.\",\"PeriodicalId\":135180,\"journal\":{\"name\":\"Proceedings of the 2nd International Conference on Applied Science, Engineering and Social Sciences\",\"volume\":\"49 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 2nd International Conference on Applied Science, Engineering and Social Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5220/0009877700480053\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2nd International Conference on Applied Science, Engineering and Social Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5220/0009877700480053","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

农民急需水,特别是在Gunungkidul地区,因为他们农场的灌溉依赖于降雨。这不是一个幸运的条件。旱季干旱,雨季丰水。此外,它们被水覆盖的面积很大。因此,当地政府急需进行灌溉管理,如修建水库,不断提供供水。本研究旨在运用可行性分析方法,即净现值、效益成本比、内部收益率。本研究亦透过不同的利率模式进行敏感度分析。先前的研究已经实施了经济分析来检查公共投资,但在这种情况下,水库工程必须释放社区的土地和社区的植被。本研究表明,恩邦克顿堡项目符合执行条件,这一结果有助于研究公共投资必须牺牲私人土地和植被。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Feasebility Analysis of Public Investment: Evidence of Reservoir
: Farmers need water urgently, especially in District of Gunungkidul, because their farm’s irrigation depend on rainfall. It is not a lucky condition. They face drought in dry season, but rudundant water is in rainy season. Moreover, their area covered by water significantly. Therefore, irrigation management is urgent for the local government, such as build a reservoir for providing water supply constantly. This study aims to perform feasibility analysis approach, namely net present value, benefit cost ratio, and internal return rate. This study also implement sensivity analysis through different schema of interest rate. Prior research has implemented economic analysis to examine public investment, but in this case, the reservoir’s project has to release communities’ land and communities’ vegetation. This study reveals that the project of Embung Kedung Poh is eligible to execute and this result contributes to reseach about public investment that have to sacrifice private land and vegetation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信