大型全球分布式工业软件项目调度风险评估的实证方法

Alberto Avritzer, A. Lima
{"title":"大型全球分布式工业软件项目调度风险评估的实证方法","authors":"Alberto Avritzer, A. Lima","doi":"10.1109/ICGSE.2009.53","DOIUrl":null,"url":null,"abstract":"We describe an empirical approach for the assessment of the scheduling risk in a large globally distributed industrial software project. We analyzed two and half years of project data and we identified some factors that are likely to impact team productivity and that could affect the team’s ability to meet its schedule objective. We built an analytical model to capture team’s productivity variability, which can be used to approximate the total time required to complete the project. Our approach is designed to be used by project management groups to perform risk assessment early in the software development process.","PeriodicalId":137777,"journal":{"name":"2009 Fourth IEEE International Conference on Global Software Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-07-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"19","resultStr":"{\"title\":\"An Empirical Approach for the Assessment of Scheduling Risk in a Large Globally Distributed Industrial Software Project\",\"authors\":\"Alberto Avritzer, A. Lima\",\"doi\":\"10.1109/ICGSE.2009.53\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We describe an empirical approach for the assessment of the scheduling risk in a large globally distributed industrial software project. We analyzed two and half years of project data and we identified some factors that are likely to impact team productivity and that could affect the team’s ability to meet its schedule objective. We built an analytical model to capture team’s productivity variability, which can be used to approximate the total time required to complete the project. Our approach is designed to be used by project management groups to perform risk assessment early in the software development process.\",\"PeriodicalId\":137777,\"journal\":{\"name\":\"2009 Fourth IEEE International Conference on Global Software Engineering\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-07-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"19\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Fourth IEEE International Conference on Global Software Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICGSE.2009.53\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Fourth IEEE International Conference on Global Software Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICGSE.2009.53","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 19

摘要

本文描述了一种评估大型全球分布式工业软件项目调度风险的经验方法。我们分析了两年半的项目数据,我们确定了一些可能影响团队生产力的因素,这些因素可能会影响团队实现其进度目标的能力。我们建立了一个分析模型来获取团队的生产力可变性,它可以用来估计完成项目所需的总时间。我们的方法被设计为项目管理小组用来在软件开发过程的早期执行风险评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An Empirical Approach for the Assessment of Scheduling Risk in a Large Globally Distributed Industrial Software Project
We describe an empirical approach for the assessment of the scheduling risk in a large globally distributed industrial software project. We analyzed two and half years of project data and we identified some factors that are likely to impact team productivity and that could affect the team’s ability to meet its schedule objective. We built an analytical model to capture team’s productivity variability, which can be used to approximate the total time required to complete the project. Our approach is designed to be used by project management groups to perform risk assessment early in the software development process.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信