可变可用功率下多级海水淡化厂的启发式控制

A. Serna, F. Tadeo, David Torrijos
{"title":"可变可用功率下多级海水淡化厂的启发式控制","authors":"A. Serna, F. Tadeo, David Torrijos","doi":"10.1109/STA.2014.7086793","DOIUrl":null,"url":null,"abstract":"A heuristic strategy is presented and evaluated to operate desalination plants designed for variable power availability. This control strategy is based on two consecutive steps: first developing a prioritized list of units of the water plant based on the current state of the plant and the expected water demand, and then distributing the available energy among those units following the prioritized list. The proposed strategy is evaluated on a case study: a desalination plant designed for production of demineralized water powered by a combination of wind and wave energy. Simulation results show the correct operation of the plant under this control.","PeriodicalId":125957,"journal":{"name":"2014 15th International Conference on Sciences and Techniques of Automatic Control and Computer Engineering (STA)","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Heuristic control of multi-stage desalination plants under variable available power\",\"authors\":\"A. Serna, F. Tadeo, David Torrijos\",\"doi\":\"10.1109/STA.2014.7086793\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A heuristic strategy is presented and evaluated to operate desalination plants designed for variable power availability. This control strategy is based on two consecutive steps: first developing a prioritized list of units of the water plant based on the current state of the plant and the expected water demand, and then distributing the available energy among those units following the prioritized list. The proposed strategy is evaluated on a case study: a desalination plant designed for production of demineralized water powered by a combination of wind and wave energy. Simulation results show the correct operation of the plant under this control.\",\"PeriodicalId\":125957,\"journal\":{\"name\":\"2014 15th International Conference on Sciences and Techniques of Automatic Control and Computer Engineering (STA)\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 15th International Conference on Sciences and Techniques of Automatic Control and Computer Engineering (STA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/STA.2014.7086793\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 15th International Conference on Sciences and Techniques of Automatic Control and Computer Engineering (STA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/STA.2014.7086793","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

提出了一种启发式策略,并对其进行了评价。该控制策略基于两个连续的步骤:首先根据水厂的当前状态和预期需水量制定水厂机组的优先级列表,然后根据优先级列表在这些机组之间分配可用能源。拟议的战略在一个案例研究中得到了评价:一个设计用于生产由风能和波浪能组合提供动力的脱盐水的脱盐工厂。仿真结果表明,在此控制下装置运行正常。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Heuristic control of multi-stage desalination plants under variable available power
A heuristic strategy is presented and evaluated to operate desalination plants designed for variable power availability. This control strategy is based on two consecutive steps: first developing a prioritized list of units of the water plant based on the current state of the plant and the expected water demand, and then distributing the available energy among those units following the prioritized list. The proposed strategy is evaluated on a case study: a desalination plant designed for production of demineralized water powered by a combination of wind and wave energy. Simulation results show the correct operation of the plant under this control.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信