{"title":"冷凝电厂用户供热现代化的选择","authors":"D. Balzamov, I. Akhmetova, E. Balzamova","doi":"10.38028/esr.2021.02.0004","DOIUrl":null,"url":null,"abstract":"High competition and strict requirements of the wholesale electricity and capacity market make optimization of heat supply schemes an urgent issue for generating companies. Replacement of life-expired generation equipment with new capacities based on advanced technologies is a priority goal for the energy industry development. This work focuses on condensing power plant (CPP), which is the only source in the city that supplies heat to all consumer categories. The plant carries out quantitative and qualitative heat supply regulation according to the temperature profile of 135/70°C with a cutoff of 110/70°C. The study examines the possibility of CPP modernization based on three options: building a pressure-reducing cooling unit 140/12, commissioning an auxiliary boiler house, and building a 110 MW combined-cycle gas plant. This paper presents technical solutions for the considered options and preliminary technical and economic calculations of their efficiency.","PeriodicalId":171218,"journal":{"name":"Energy Systems Research","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Options for Modernization of Heat Supply to Consumers of Condensing Power Plant\",\"authors\":\"D. Balzamov, I. Akhmetova, E. Balzamova\",\"doi\":\"10.38028/esr.2021.02.0004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"High competition and strict requirements of the wholesale electricity and capacity market make optimization of heat supply schemes an urgent issue for generating companies. Replacement of life-expired generation equipment with new capacities based on advanced technologies is a priority goal for the energy industry development. This work focuses on condensing power plant (CPP), which is the only source in the city that supplies heat to all consumer categories. The plant carries out quantitative and qualitative heat supply regulation according to the temperature profile of 135/70°C with a cutoff of 110/70°C. The study examines the possibility of CPP modernization based on three options: building a pressure-reducing cooling unit 140/12, commissioning an auxiliary boiler house, and building a 110 MW combined-cycle gas plant. This paper presents technical solutions for the considered options and preliminary technical and economic calculations of their efficiency.\",\"PeriodicalId\":171218,\"journal\":{\"name\":\"Energy Systems Research\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Energy Systems Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.38028/esr.2021.02.0004\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energy Systems Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.38028/esr.2021.02.0004","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

批发电力和容量市场的激烈竞争和严格要求使得供热方案的优化成为发电企业迫切需要解决的问题。以先进技术为基础的发电设备更新换代是能源工业发展的优先目标。这项工作的重点是冷凝电厂(CPP),这是城市中唯一向所有消费类别提供热量的来源。工厂根据135/70℃的温度曲线进行定量和定性供热调节,截止温度为110/70℃。该研究基于三个选项考察了CPP现代化的可能性:建造一个减压冷却装置140/12,调试一个辅助锅炉房,建造一个110兆瓦的联合循环燃气发电厂。本文对所考虑的方案提出了技术方案,并对其效率进行了初步的技术经济计算。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Options for Modernization of Heat Supply to Consumers of Condensing Power Plant
High competition and strict requirements of the wholesale electricity and capacity market make optimization of heat supply schemes an urgent issue for generating companies. Replacement of life-expired generation equipment with new capacities based on advanced technologies is a priority goal for the energy industry development. This work focuses on condensing power plant (CPP), which is the only source in the city that supplies heat to all consumer categories. The plant carries out quantitative and qualitative heat supply regulation according to the temperature profile of 135/70°C with a cutoff of 110/70°C. The study examines the possibility of CPP modernization based on three options: building a pressure-reducing cooling unit 140/12, commissioning an auxiliary boiler house, and building a 110 MW combined-cycle gas plant. This paper presents technical solutions for the considered options and preliminary technical and economic calculations of their efficiency.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信