Wiky Sabardi, Ryan Pramanda, Dewiyana, Diki Suhanda
{"title":"通过使用赫尔格森- birnie方法(具有正体重)生产效率的设计方法来提高生产能力(I Shift生产单位的个案研究)","authors":"Wiky Sabardi, Ryan Pramanda, Dewiyana, Diki Suhanda","doi":"10.55377/jurutera.v8i02.5534","DOIUrl":null,"url":null,"abstract":"The problem of line balancing in industry, assembling, and manufacturing often occurs. This is indicated by a relatively high bottleneck of work in process at several stations, resulting in non-optimal line efficiency and non-smooth process flow. This study aims to calculate line balancing and determine the division of work stations that can increase production capacity in the production unit I shift I pt. Magnificent resource. This study used the Helgeson-Birnie (Ranked Positional Weight) method. From this research, the design results were obtained with line efficiency (line efficiency) 89.16%, idle time 2730.85, balance delay 10.84%, smoothness index (smoothness index) 781.24, and the number of work stations 15. Based on the calculation, it can be seen that there is an increase in line efficiency from 74.46% to 89.35%, which is 14.89%.","PeriodicalId":414829,"journal":{"name":"JURUTERA - Jurnal Umum Teknik Terapan","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Perancangan Efisiensi Lintasan Produksi dengan Menggunakan Metode Helgeson-Birnie (Ranked Positional Weight) Untuk Meningkatkan Kapasitas Produksi (Studi Kasus Pada Unit Produksi I Shift I PT. SUMBETRI MEGAH)\",\"authors\":\"Wiky Sabardi, Ryan Pramanda, Dewiyana, Diki Suhanda\",\"doi\":\"10.55377/jurutera.v8i02.5534\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The problem of line balancing in industry, assembling, and manufacturing often occurs. This is indicated by a relatively high bottleneck of work in process at several stations, resulting in non-optimal line efficiency and non-smooth process flow. This study aims to calculate line balancing and determine the division of work stations that can increase production capacity in the production unit I shift I pt. Magnificent resource. This study used the Helgeson-Birnie (Ranked Positional Weight) method. From this research, the design results were obtained with line efficiency (line efficiency) 89.16%, idle time 2730.85, balance delay 10.84%, smoothness index (smoothness index) 781.24, and the number of work stations 15. Based on the calculation, it can be seen that there is an increase in line efficiency from 74.46% to 89.35%, which is 14.89%.\",\"PeriodicalId\":414829,\"journal\":{\"name\":\"JURUTERA - Jurnal Umum Teknik Terapan\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JURUTERA - Jurnal Umum Teknik Terapan\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55377/jurutera.v8i02.5534\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURUTERA - Jurnal Umum Teknik Terapan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55377/jurutera.v8i02.5534","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Perancangan Efisiensi Lintasan Produksi dengan Menggunakan Metode Helgeson-Birnie (Ranked Positional Weight) Untuk Meningkatkan Kapasitas Produksi (Studi Kasus Pada Unit Produksi I Shift I PT. SUMBETRI MEGAH)
The problem of line balancing in industry, assembling, and manufacturing often occurs. This is indicated by a relatively high bottleneck of work in process at several stations, resulting in non-optimal line efficiency and non-smooth process flow. This study aims to calculate line balancing and determine the division of work stations that can increase production capacity in the production unit I shift I pt. Magnificent resource. This study used the Helgeson-Birnie (Ranked Positional Weight) method. From this research, the design results were obtained with line efficiency (line efficiency) 89.16%, idle time 2730.85, balance delay 10.84%, smoothness index (smoothness index) 781.24, and the number of work stations 15. Based on the calculation, it can be seen that there is an increase in line efficiency from 74.46% to 89.35%, which is 14.89%.