印尼大坝运行与维护中的战略问题

A. Idris, A. Permadi, Unika Merlin Sianturi, F. Hazet
{"title":"印尼大坝运行与维护中的战略问题","authors":"A. Idris, A. Permadi, Unika Merlin Sianturi, F. Hazet","doi":"10.36574/jpp.v3i2.76","DOIUrl":null,"url":null,"abstract":"Strategic issues in dam operation and maintenance are important to meet domestic water needs and the study was conducted by the Dam Operational Improvement and Safety Project (DOISP) in two phases. DOISP Phase I was established to continue the Dam Safety Program with the focus on the operational improvement and the safety of dams. The Dam Operational Improvement and Safety Project Phase II (DOISP Phase II) is a continuation of DOISP Phase I that previously has provided support to the completion of remedial and rehabilitation works and operational and safety improvement of 34 dams owned the Ministry of Public Works and Housing (MPWH) as well as the preparation of various guidelines which relate to the dam management operation. Strategic issues in operation and maintenance are prepared in 2020-2024, strategic plan by the Directorate of Water Resources and Irrigation (Ministry of National Development Planning/Bappenas). Planning based on strategic issues in operation and maintenance is important because a dam and reservoir can support hydropower, navigation, recreation, flood control, irrigation, and water supply, with each multipurpose benefit having a significant social and economic impact at the local level, regional and national.","PeriodicalId":209567,"journal":{"name":"Jurnal Perencanaan Pembangunan: The Indonesian Journal of Development Planning","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Strategic Issues in Dam Operation and Maintenance in Indonesia\",\"authors\":\"A. Idris, A. Permadi, Unika Merlin Sianturi, F. Hazet\",\"doi\":\"10.36574/jpp.v3i2.76\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Strategic issues in dam operation and maintenance are important to meet domestic water needs and the study was conducted by the Dam Operational Improvement and Safety Project (DOISP) in two phases. DOISP Phase I was established to continue the Dam Safety Program with the focus on the operational improvement and the safety of dams. The Dam Operational Improvement and Safety Project Phase II (DOISP Phase II) is a continuation of DOISP Phase I that previously has provided support to the completion of remedial and rehabilitation works and operational and safety improvement of 34 dams owned the Ministry of Public Works and Housing (MPWH) as well as the preparation of various guidelines which relate to the dam management operation. Strategic issues in operation and maintenance are prepared in 2020-2024, strategic plan by the Directorate of Water Resources and Irrigation (Ministry of National Development Planning/Bappenas). Planning based on strategic issues in operation and maintenance is important because a dam and reservoir can support hydropower, navigation, recreation, flood control, irrigation, and water supply, with each multipurpose benefit having a significant social and economic impact at the local level, regional and national.\",\"PeriodicalId\":209567,\"journal\":{\"name\":\"Jurnal Perencanaan Pembangunan: The Indonesian Journal of Development Planning\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Perencanaan Pembangunan: The Indonesian Journal of Development Planning\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36574/jpp.v3i2.76\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Perencanaan Pembangunan: The Indonesian Journal of Development Planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36574/jpp.v3i2.76","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

大坝运行和维护中的战略问题对满足生活用水需求至关重要,该研究由大坝运行改善和安全项目(DOISP)分两个阶段进行。DOISP第一期的建立是为了继续大坝安全计划,重点是改善大坝的运行和安全。大坝运行改善和安全项目二期(DOISP二期)是DOISP一期的延续,之前为公共工程和住住部(MPWH)拥有的34座大坝的修复和修复工程以及运行和安全改善提供了支持,并制定了与大坝管理运行相关的各种指导方针。根据水资源和灌溉局(国家发展规划部)的战略计划,在2020-2024年制定了运营和维护方面的战略问题。基于运营和维护战略问题的规划是重要的,因为大坝和水库可以支持水电、航运、娱乐、防洪、灌溉和供水,每一项多用途效益都在地方、区域和国家层面产生重大的社会和经济影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Strategic Issues in Dam Operation and Maintenance in Indonesia
Strategic issues in dam operation and maintenance are important to meet domestic water needs and the study was conducted by the Dam Operational Improvement and Safety Project (DOISP) in two phases. DOISP Phase I was established to continue the Dam Safety Program with the focus on the operational improvement and the safety of dams. The Dam Operational Improvement and Safety Project Phase II (DOISP Phase II) is a continuation of DOISP Phase I that previously has provided support to the completion of remedial and rehabilitation works and operational and safety improvement of 34 dams owned the Ministry of Public Works and Housing (MPWH) as well as the preparation of various guidelines which relate to the dam management operation. Strategic issues in operation and maintenance are prepared in 2020-2024, strategic plan by the Directorate of Water Resources and Irrigation (Ministry of National Development Planning/Bappenas). Planning based on strategic issues in operation and maintenance is important because a dam and reservoir can support hydropower, navigation, recreation, flood control, irrigation, and water supply, with each multipurpose benefit having a significant social and economic impact at the local level, regional and national.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信