{"title":"长壁开采对宾夕法尼亚州I-70的影响","authors":"Emily Adelsohn, A. Iannacchione, J. Vandenbossche, R. Winn, Mingzhou Li, Luis Vallejo, Roy Painter, Joe Szczur, Eric Wanson, Steve Marsinko","doi":"10.33593/m8velmw2","DOIUrl":null,"url":null,"abstract":"A longwall mine was constructed beneath I-70 near the Pennsylvania-West Virginia border between December 2018 and March 2019. This resulted in over a 4-ft drop in the elevation of parts of the roadway. The Pennsylvania Department of Transportation was able to maintain the roadway open to traffic throughout the subsidence period after it was undermined. This paper will describe the steps taken by PennDOT to ensure the roadway could stay in service throughout the subsidence event with minimal traffic disruptions, the subsidence basin that developed as a result of mining, and the distresses that developed within the pavement structures as a result of the subsidence.","PeriodicalId":265129,"journal":{"name":"Proceedings of the 12th International Conference on Concrete Pavements","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Effect of Longwall Mining on Pennsylvania I-70\",\"authors\":\"Emily Adelsohn, A. Iannacchione, J. Vandenbossche, R. Winn, Mingzhou Li, Luis Vallejo, Roy Painter, Joe Szczur, Eric Wanson, Steve Marsinko\",\"doi\":\"10.33593/m8velmw2\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A longwall mine was constructed beneath I-70 near the Pennsylvania-West Virginia border between December 2018 and March 2019. This resulted in over a 4-ft drop in the elevation of parts of the roadway. The Pennsylvania Department of Transportation was able to maintain the roadway open to traffic throughout the subsidence period after it was undermined. This paper will describe the steps taken by PennDOT to ensure the roadway could stay in service throughout the subsidence event with minimal traffic disruptions, the subsidence basin that developed as a result of mining, and the distresses that developed within the pavement structures as a result of the subsidence.\",\"PeriodicalId\":265129,\"journal\":{\"name\":\"Proceedings of the 12th International Conference on Concrete Pavements\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 12th International Conference on Concrete Pavements\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33593/m8velmw2\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 12th International Conference on Concrete Pavements","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33593/m8velmw2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

2018年12月至2019年3月,在宾夕法尼亚州和西弗吉尼亚州边境附近的I-70号州际公路下建造了一座长壁矿井。这导致部分道路的高度下降了4英尺多。宾夕法尼亚州交通部在道路被破坏后的整个下沉期间保持了道路的畅通。本文将介绍PennDOT采取的措施,以确保巷道在整个沉陷事件中保持服务,并将交通中断降到最低,以及由于采矿而形成的沉陷盆地,以及由于沉陷而在路面结构内形成的困扰。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Effect of Longwall Mining on Pennsylvania I-70
A longwall mine was constructed beneath I-70 near the Pennsylvania-West Virginia border between December 2018 and March 2019. This resulted in over a 4-ft drop in the elevation of parts of the roadway. The Pennsylvania Department of Transportation was able to maintain the roadway open to traffic throughout the subsidence period after it was undermined. This paper will describe the steps taken by PennDOT to ensure the roadway could stay in service throughout the subsidence event with minimal traffic disruptions, the subsidence basin that developed as a result of mining, and the distresses that developed within the pavement structures as a result of the subsidence.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信