{"title":"公私合作生态系统转型","authors":"M. Tsurkan, N. Orlova","doi":"10.2991/assehr.k.201105.014","DOIUrl":null,"url":null,"abstract":"The paper discusses key ways of modifying public-private partnership ecosystem. The necessity of making changes is caused by the COVID-19 pandemic. The article systematizes the concept of interaction between participants of public-private partnership projects within the ecosystem. The project participants are classified as obligatory and optional ones. Appropriate methods have been proposed and accordingly, structural patterns for implementation of public-private partnership projects have been stated. They are to be classified as basic and variable ones. The variables are cumulative and may include up to 3 elements. The most efficient patterns for implementation of public-private partnership projects have been stated, taking into account that the investment capacities of business entities are reduced. The digital transformation strategy for public private partnership has been developed. It implies virtualization of interactions and automation of all related processes.","PeriodicalId":184513,"journal":{"name":"Proceedings of the Research Technologies of Pandemic Coronavirus Impact (RTCOV 2020)","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Transformation of Public-Private Partnership Ecosystem\",\"authors\":\"M. Tsurkan, N. Orlova\",\"doi\":\"10.2991/assehr.k.201105.014\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper discusses key ways of modifying public-private partnership ecosystem. The necessity of making changes is caused by the COVID-19 pandemic. The article systematizes the concept of interaction between participants of public-private partnership projects within the ecosystem. The project participants are classified as obligatory and optional ones. Appropriate methods have been proposed and accordingly, structural patterns for implementation of public-private partnership projects have been stated. They are to be classified as basic and variable ones. The variables are cumulative and may include up to 3 elements. The most efficient patterns for implementation of public-private partnership projects have been stated, taking into account that the investment capacities of business entities are reduced. The digital transformation strategy for public private partnership has been developed. It implies virtualization of interactions and automation of all related processes.\",\"PeriodicalId\":184513,\"journal\":{\"name\":\"Proceedings of the Research Technologies of Pandemic Coronavirus Impact (RTCOV 2020)\",\"volume\":\"15 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Research Technologies of Pandemic Coronavirus Impact (RTCOV 2020)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2991/assehr.k.201105.014\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Research Technologies of Pandemic Coronavirus Impact (RTCOV 2020)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/assehr.k.201105.014","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Transformation of Public-Private Partnership Ecosystem
The paper discusses key ways of modifying public-private partnership ecosystem. The necessity of making changes is caused by the COVID-19 pandemic. The article systematizes the concept of interaction between participants of public-private partnership projects within the ecosystem. The project participants are classified as obligatory and optional ones. Appropriate methods have been proposed and accordingly, structural patterns for implementation of public-private partnership projects have been stated. They are to be classified as basic and variable ones. The variables are cumulative and may include up to 3 elements. The most efficient patterns for implementation of public-private partnership projects have been stated, taking into account that the investment capacities of business entities are reduced. The digital transformation strategy for public private partnership has been developed. It implies virtualization of interactions and automation of all related processes.