{"title":"基于层次分析法和改进BP神经网络的电网项目风险评估","authors":"Shuguo Zhang","doi":"10.12733/JICS20105585","DOIUrl":null,"url":null,"abstract":"A kind of risk evaluation method based on Analytic Hierarchy Process (AHP) and improved BP neural network is proposed in this paper. Importance degree of risk evaluation indexes is sorted by using the analytic hierarchy process and the risk evaluation index system is simplified, and then the simplified index acts as the input of improved BP neural network to evaluate the risk. This method simplifies the network model and improves the performance and calculation accuracy of the network. The risk of the power grid project is evaluated based on this method, indicating that this method is feasible and effective for the risk evaluation of the power grid project.","PeriodicalId":213716,"journal":{"name":"The Journal of Information and Computational Science","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Risk Evaluation of Power Grid Project Based on Analytic Hierarchy Process and Improved BP Neural Network\",\"authors\":\"Shuguo Zhang\",\"doi\":\"10.12733/JICS20105585\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A kind of risk evaluation method based on Analytic Hierarchy Process (AHP) and improved BP neural network is proposed in this paper. Importance degree of risk evaluation indexes is sorted by using the analytic hierarchy process and the risk evaluation index system is simplified, and then the simplified index acts as the input of improved BP neural network to evaluate the risk. This method simplifies the network model and improves the performance and calculation accuracy of the network. The risk of the power grid project is evaluated based on this method, indicating that this method is feasible and effective for the risk evaluation of the power grid project.\",\"PeriodicalId\":213716,\"journal\":{\"name\":\"The Journal of Information and Computational Science\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-03-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Journal of Information and Computational Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12733/JICS20105585\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Information and Computational Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12733/JICS20105585","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Risk Evaluation of Power Grid Project Based on Analytic Hierarchy Process and Improved BP Neural Network
A kind of risk evaluation method based on Analytic Hierarchy Process (AHP) and improved BP neural network is proposed in this paper. Importance degree of risk evaluation indexes is sorted by using the analytic hierarchy process and the risk evaluation index system is simplified, and then the simplified index acts as the input of improved BP neural network to evaluate the risk. This method simplifies the network model and improves the performance and calculation accuracy of the network. The risk of the power grid project is evaluated based on this method, indicating that this method is feasible and effective for the risk evaluation of the power grid project.