应用统计学方法识别建设项目延误原因(以钮扣时期建设项目为例)

Muhammad Abdu, Muhammad Chaiddir Hajia, S. Karsidi
{"title":"应用统计学方法识别建设项目延误原因(以钮扣时期建设项目为例)","authors":"Muhammad Abdu, Muhammad Chaiddir Hajia, S. Karsidi","doi":"10.35877/sainsmat769","DOIUrl":null,"url":null,"abstract":"As the economy develops in Buton Regency, construction projects are increasing. However, not all projects in progress are going according to the targeted plan. For example, the construction of the Multipurpose Building in the Takawa Buton office complex which was built from 2016 until now has not been realized. Apart from that, there are also other projects such as the road connecting Gonda and Lapodi Village in Pasarwajo Subdistrict, the road connecting Siontapina and Sangiarano Villages in South Lasalimu Subdistrict, Kamaru Capital Road in Lasalimu Subdistrict, Bonetiro Village road in Kapontori Subdistrict, etc. are still pending. in the process. This type of research is a quantitative research, where the data is processed and tested with a statistical approach. Descriptive research that provides an overview of a situation where every problem and subject will be taught systematically, actually and accurately with a deductive discussion technique where the discussion starts from general things to more specific things. There are two methods used, namely validation test and reliability test. The solution to the factors that cause delays in construction projects in the Buton Regency area is that the unavailability of equipment can hinder the project's progress. The solution is not to rely on just one vendor. Make a list of vendors who can provide the necessary tools during the project. Make sure the vendors can provide everything on time","PeriodicalId":367796,"journal":{"name":"SAINSMAT: Journal of Applied Sciences, Mathematics, and Its Education","volume":"741 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Applied Statistics to Identification of the Causes of Delays Construction Project (Case Study of Construction Project in the Regency of Buton)\",\"authors\":\"Muhammad Abdu, Muhammad Chaiddir Hajia, S. Karsidi\",\"doi\":\"10.35877/sainsmat769\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As the economy develops in Buton Regency, construction projects are increasing. However, not all projects in progress are going according to the targeted plan. For example, the construction of the Multipurpose Building in the Takawa Buton office complex which was built from 2016 until now has not been realized. Apart from that, there are also other projects such as the road connecting Gonda and Lapodi Village in Pasarwajo Subdistrict, the road connecting Siontapina and Sangiarano Villages in South Lasalimu Subdistrict, Kamaru Capital Road in Lasalimu Subdistrict, Bonetiro Village road in Kapontori Subdistrict, etc. are still pending. in the process. This type of research is a quantitative research, where the data is processed and tested with a statistical approach. Descriptive research that provides an overview of a situation where every problem and subject will be taught systematically, actually and accurately with a deductive discussion technique where the discussion starts from general things to more specific things. There are two methods used, namely validation test and reliability test. The solution to the factors that cause delays in construction projects in the Buton Regency area is that the unavailability of equipment can hinder the project's progress. The solution is not to rely on just one vendor. Make a list of vendors who can provide the necessary tools during the project. Make sure the vendors can provide everything on time\",\"PeriodicalId\":367796,\"journal\":{\"name\":\"SAINSMAT: Journal of Applied Sciences, Mathematics, and Its Education\",\"volume\":\"741 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SAINSMAT: Journal of Applied Sciences, Mathematics, and Its Education\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35877/sainsmat769\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SAINSMAT: Journal of Applied Sciences, Mathematics, and Its Education","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35877/sainsmat769","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

随着钮顿摄政经济的发展,建筑项目越来越多。然而,并非所有正在进行的项目都按照目标计划进行。例如,从2016年开始建设到现在的高川按钮综合办公大楼的多功能大楼建设一直没有实现。除此之外,还有其他项目,如连接Pasarwajo街道Gonda和Lapodi村的道路,连接南Lasalimu街道Siontapina和Sangiarano村的道路,Lasalimu街道Kamaru首都路,Kapontori街道Bonetiro村路等仍在等待中。在这个过程中。这种类型的研究是一种定量研究,其中数据是用统计方法处理和测试的。描述性研究提供了一个情况的概述,每个问题和主题都将被系统地、实际地、准确地教授,并采用演绎讨论技术,讨论从一般事物开始到更具体的事物。采用两种方法,即验证试验和信度试验。对于造成Buton Regency地区建设项目延迟的因素的解决方案是,设备的不可用会阻碍项目的进展。解决方案不是只依赖一个供应商。列出在项目期间可以提供必要工具的供应商名单。确保供应商能按时提供所有的东西
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Applied Statistics to Identification of the Causes of Delays Construction Project (Case Study of Construction Project in the Regency of Buton)
As the economy develops in Buton Regency, construction projects are increasing. However, not all projects in progress are going according to the targeted plan. For example, the construction of the Multipurpose Building in the Takawa Buton office complex which was built from 2016 until now has not been realized. Apart from that, there are also other projects such as the road connecting Gonda and Lapodi Village in Pasarwajo Subdistrict, the road connecting Siontapina and Sangiarano Villages in South Lasalimu Subdistrict, Kamaru Capital Road in Lasalimu Subdistrict, Bonetiro Village road in Kapontori Subdistrict, etc. are still pending. in the process. This type of research is a quantitative research, where the data is processed and tested with a statistical approach. Descriptive research that provides an overview of a situation where every problem and subject will be taught systematically, actually and accurately with a deductive discussion technique where the discussion starts from general things to more specific things. There are two methods used, namely validation test and reliability test. The solution to the factors that cause delays in construction projects in the Buton Regency area is that the unavailability of equipment can hinder the project's progress. The solution is not to rely on just one vendor. Make a list of vendors who can provide the necessary tools during the project. Make sure the vendors can provide everything on time
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信