{"title":"ANALISA MATRIK LINTASAN BERDASARKAN PRECEDENCE DIAGRAM DENGAN MENGGUNAKAN METODE RANKED POSITIONAL WEIGHT","authors":"Wiki Sabardi","doi":"10.55377/jurutera.v9i01.7767","DOIUrl":null,"url":null,"abstract":"Line balance problems are common in both the assembly and manufacturing industries. This is evidenced by the fact that some workstations have relatively high work congestion, less than Suboptimal line efficiency and non-smooth process flow this research is to: determine the line balancing by making the best path matrix based on the division of workstations. This study uses the Helgeson-Birnie method. This research resulted in design results of line efficiency of 89.16%, idle time of 2683.64, transient delay of 10.84%, smoothness index of 843.88, and 15 workstations. Based on special calculations for changes in the smoothness value, there is a decrease in the smoothness index value from 2041.72 to 843.88.","PeriodicalId":414829,"journal":{"name":"JURUTERA - Jurnal Umum Teknik Terapan","volume":"64 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURUTERA - Jurnal Umum Teknik Terapan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55377/jurutera.v9i01.7767","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

生产线平衡问题在装配和制造行业都很常见。这可以从一些工作站存在较高的工作拥塞,低于次优的线路效率和不顺畅的工艺流程中得到证明。本研究是:通过基于工作站划分的最优路径矩阵来确定线路平衡。本研究采用Helgeson-Birnie方法。本研究得出线路效率89.16%,空闲时间2683.64,暂态时延10.84%,平滑指数843.88,15个工作站的设计结果。通过对平滑度值变化的专门计算,平滑度指标值从2041.72下降到843.88。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISA MATRIK LINTASAN BERDASARKAN PRECEDENCE DIAGRAM DENGAN MENGGUNAKAN METODE RANKED POSITIONAL WEIGHT
Line balance problems are common in both the assembly and manufacturing industries. This is evidenced by the fact that some workstations have relatively high work congestion, less than Suboptimal line efficiency and non-smooth process flow this research is to: determine the line balancing by making the best path matrix based on the division of workstations. This study uses the Helgeson-Birnie method. This research resulted in design results of line efficiency of 89.16%, idle time of 2683.64, transient delay of 10.84%, smoothness index of 843.88, and 15 workstations. Based on special calculations for changes in the smoothness value, there is a decrease in the smoothness index value from 2041.72 to 843.88.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信