{"title":"解除管制的市场体制下的主电网发展规划","authors":"K.S. Hornnes, O. S. Grande, B. Bakken","doi":"10.1109/PESW.2000.850035","DOIUrl":null,"url":null,"abstract":"To inspire the monopoly network owners to act in a rational and socio-economic way, the Norwegian authorities have introduced an incentive-based regulation regime. Experiences show that this regime has a shortage with respect to main grid development. A vital aspect of the regime is to provide corporate profitability to projects that are proven to be socio-economic profitable. The weak point in current regime is the lack of correlation between the effect of improved network utilisation due to an investment and the calculated corporate profit of the investment. A correct calculation of socio-economic benefit of an investment is essential in an improved future regime. This paper describes an improved method for simulation of main grid utilisation including a market clearing process where transmission restrictions are taken into account. In the Norwegian hydro dominated system, there is a strong and stochastic variability of timing and location of energy input to the system, and certain flexibility on the market side. The model takes these aspects into account in calculation of reduced cost associated with congestion and changes in cost of losses.","PeriodicalId":286352,"journal":{"name":"2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077)","volume":"42 4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-01-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":"{\"title\":\"Main grid development planning in a deregulated market regime\",\"authors\":\"K.S. Hornnes, O. S. Grande, B. Bakken\",\"doi\":\"10.1109/PESW.2000.850035\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To inspire the monopoly network owners to act in a rational and socio-economic way, the Norwegian authorities have introduced an incentive-based regulation regime. Experiences show that this regime has a shortage with respect to main grid development. A vital aspect of the regime is to provide corporate profitability to projects that are proven to be socio-economic profitable. The weak point in current regime is the lack of correlation between the effect of improved network utilisation due to an investment and the calculated corporate profit of the investment. A correct calculation of socio-economic benefit of an investment is essential in an improved future regime. This paper describes an improved method for simulation of main grid utilisation including a market clearing process where transmission restrictions are taken into account. In the Norwegian hydro dominated system, there is a strong and stochastic variability of timing and location of energy input to the system, and certain flexibility on the market side. The model takes these aspects into account in calculation of reduced cost associated with congestion and changes in cost of losses.\",\"PeriodicalId\":286352,\"journal\":{\"name\":\"2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077)\",\"volume\":\"42 4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-01-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"12\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PESW.2000.850035\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESW.2000.850035","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

摘要

为了激励垄断网络所有者以理性和社会经济的方式行事,挪威当局引入了一种基于激励的监管制度。经验表明,这种制度在主网发展方面存在不足。该制度的一个重要方面是为证明具有社会经济效益的项目提供公司盈利能力。当前制度的弱点是,由于投资而提高网络利用率的效果与计算出的投资公司利润之间缺乏相关性。正确计算一项投资的社会经济效益对于改善未来的制度至关重要。本文描述了一种改进的主电网利用模拟方法,包括考虑传输限制的市场清算过程。在挪威水电主导的系统中,系统能量输入的时间和位置具有很强的随机可变性,并且在市场方面具有一定的灵活性。该模型在计算与拥堵相关的减少成本和损失成本的变化时考虑了这些方面。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Main grid development planning in a deregulated market regime
To inspire the monopoly network owners to act in a rational and socio-economic way, the Norwegian authorities have introduced an incentive-based regulation regime. Experiences show that this regime has a shortage with respect to main grid development. A vital aspect of the regime is to provide corporate profitability to projects that are proven to be socio-economic profitable. The weak point in current regime is the lack of correlation between the effect of improved network utilisation due to an investment and the calculated corporate profit of the investment. A correct calculation of socio-economic benefit of an investment is essential in an improved future regime. This paper describes an improved method for simulation of main grid utilisation including a market clearing process where transmission restrictions are taken into account. In the Norwegian hydro dominated system, there is a strong and stochastic variability of timing and location of energy input to the system, and certain flexibility on the market side. The model takes these aspects into account in calculation of reduced cost associated with congestion and changes in cost of losses.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信