电力和天然气的整合:西班牙的经验

E. Parrilla
{"title":"电力和天然气的整合:西班牙的经验","authors":"E. Parrilla","doi":"10.1109/PES.2009.5275541","DOIUrl":null,"url":null,"abstract":"Through the end of the 20th century and beginning of 21st century, the Spanish policy-makers have had a strong commitment to the development of renewable energies and clean power technologies, mainly related with wind power and combined cycles. This commitment has involved several technical, regulatory and operational challenges, but perhaps the most critical of these has been the development of a gas system capable of supplying gas to the 21,667 MW new combined cycles built in Spain since 2002, and the required flexibility to complement and, when required, substitute the unpredictable wind power generation, currently around 15,500 MW and increasing steadily. This gas network system is characterized by the lack of underground storage, the role of the Liquefied Natural Gas (LNG), a competitive gas market, and sharp demand rise, mainly due to the boom of the combined cycles that has led to important investments in new infrastructure during the past years. This paper provides an overview of the Spanish gas market and its implications over the Spanish power system.","PeriodicalId":258632,"journal":{"name":"2009 IEEE Power & Energy Society General Meeting","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-07-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Power and gas integration: The Spanish experience\",\"authors\":\"E. Parrilla\",\"doi\":\"10.1109/PES.2009.5275541\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Through the end of the 20th century and beginning of 21st century, the Spanish policy-makers have had a strong commitment to the development of renewable energies and clean power technologies, mainly related with wind power and combined cycles. This commitment has involved several technical, regulatory and operational challenges, but perhaps the most critical of these has been the development of a gas system capable of supplying gas to the 21,667 MW new combined cycles built in Spain since 2002, and the required flexibility to complement and, when required, substitute the unpredictable wind power generation, currently around 15,500 MW and increasing steadily. This gas network system is characterized by the lack of underground storage, the role of the Liquefied Natural Gas (LNG), a competitive gas market, and sharp demand rise, mainly due to the boom of the combined cycles that has led to important investments in new infrastructure during the past years. This paper provides an overview of the Spanish gas market and its implications over the Spanish power system.\",\"PeriodicalId\":258632,\"journal\":{\"name\":\"2009 IEEE Power & Energy Society General Meeting\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-07-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 IEEE Power & Energy Society General Meeting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PES.2009.5275541\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE Power & Energy Society General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2009.5275541","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

从20世纪末到21世纪初,西班牙政策制定者一直致力于可再生能源和清洁能源技术的发展,主要与风力发电和联合循环有关。这一承诺涉及到一些技术、监管和运营方面的挑战,但其中最关键的可能是开发一个能够为西班牙自2002年以来新建的21,667兆瓦联合循环提供天然气的天然气系统,以及所需的灵活性,以补充和在需要时替代不可预测的风力发电,目前约为15,500兆瓦,并在稳步增长。这种天然气网络系统的特点是缺乏地下储存,液化天然气(LNG)的作用,竞争激烈的天然气市场,以及需求的急剧上升,这主要是由于联合循环的繁荣,导致了过去几年对新基础设施的重要投资。本文概述了西班牙天然气市场及其对西班牙电力系统的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Power and gas integration: The Spanish experience
Through the end of the 20th century and beginning of 21st century, the Spanish policy-makers have had a strong commitment to the development of renewable energies and clean power technologies, mainly related with wind power and combined cycles. This commitment has involved several technical, regulatory and operational challenges, but perhaps the most critical of these has been the development of a gas system capable of supplying gas to the 21,667 MW new combined cycles built in Spain since 2002, and the required flexibility to complement and, when required, substitute the unpredictable wind power generation, currently around 15,500 MW and increasing steadily. This gas network system is characterized by the lack of underground storage, the role of the Liquefied Natural Gas (LNG), a competitive gas market, and sharp demand rise, mainly due to the boom of the combined cycles that has led to important investments in new infrastructure during the past years. This paper provides an overview of the Spanish gas market and its implications over the Spanish power system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信