{"title":"基于混合冲突解决的分布式路由规划与调度","authors":"R. Thangarajoo, H. Lau","doi":"10.1109/WI-IAT.2010.257","DOIUrl":null,"url":null,"abstract":"In this paper, we discuss the problem of route planning and scheduling by a group of agents. Each agent is responsible for designing a route plan and schedule over a geographical network, and the goal is to obtain a conflict-free plan/schedule that optimizes a global objective. We present a hybrid conflict resolution method that involves coalition formation and distributed constraint satisfaction depending on the level of coupling between agents. We show how this approach can be effectively applied to solve a distributed convoy movement planning problem.","PeriodicalId":340211,"journal":{"name":"2010 IEEE/WIC/ACM International Conference on Web Intelligence and Intelligent Agent Technology","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-08-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Distributed Route Planning and Scheduling via Hybrid Conflict Resolution\",\"authors\":\"R. Thangarajoo, H. Lau\",\"doi\":\"10.1109/WI-IAT.2010.257\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, we discuss the problem of route planning and scheduling by a group of agents. Each agent is responsible for designing a route plan and schedule over a geographical network, and the goal is to obtain a conflict-free plan/schedule that optimizes a global objective. We present a hybrid conflict resolution method that involves coalition formation and distributed constraint satisfaction depending on the level of coupling between agents. We show how this approach can be effectively applied to solve a distributed convoy movement planning problem.\",\"PeriodicalId\":340211,\"journal\":{\"name\":\"2010 IEEE/WIC/ACM International Conference on Web Intelligence and Intelligent Agent Technology\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-08-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 IEEE/WIC/ACM International Conference on Web Intelligence and Intelligent Agent Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WI-IAT.2010.257\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE/WIC/ACM International Conference on Web Intelligence and Intelligent Agent Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WI-IAT.2010.257","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Distributed Route Planning and Scheduling via Hybrid Conflict Resolution
In this paper, we discuss the problem of route planning and scheduling by a group of agents. Each agent is responsible for designing a route plan and schedule over a geographical network, and the goal is to obtain a conflict-free plan/schedule that optimizes a global objective. We present a hybrid conflict resolution method that involves coalition formation and distributed constraint satisfaction depending on the level of coupling between agents. We show how this approach can be effectively applied to solve a distributed convoy movement planning problem.