{"title":"执行过程模型:活动和项目管理","authors":"G. Chroust, Stefan Hardt","doi":"10.1109/ECBS.1996.494562","DOIUrl":null,"url":null,"abstract":"Developing software products is both a technical and a managerial challenge. The integration of these two areas (the logical/technical prescription of the process model with the resource-oriented planning and control of project management), however, still needs further discussion and clarification. We discuss the relation of the components of a software development process and their counterparts in project management. We also show how an integrated software engineering environment handles software process enactment based on both activities defined via a process model and on requirements resulting from project management.","PeriodicalId":244671,"journal":{"name":"Proceedings IEEE Symposium and Workshop on Engineering of Computer-Based Systems","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-03-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"Executing process models: activity and project management\",\"authors\":\"G. Chroust, Stefan Hardt\",\"doi\":\"10.1109/ECBS.1996.494562\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Developing software products is both a technical and a managerial challenge. The integration of these two areas (the logical/technical prescription of the process model with the resource-oriented planning and control of project management), however, still needs further discussion and clarification. We discuss the relation of the components of a software development process and their counterparts in project management. We also show how an integrated software engineering environment handles software process enactment based on both activities defined via a process model and on requirements resulting from project management.\",\"PeriodicalId\":244671,\"journal\":{\"name\":\"Proceedings IEEE Symposium and Workshop on Engineering of Computer-Based Systems\",\"volume\":\"62 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1996-03-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings IEEE Symposium and Workshop on Engineering of Computer-Based Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ECBS.1996.494562\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings IEEE Symposium and Workshop on Engineering of Computer-Based Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ECBS.1996.494562","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Executing process models: activity and project management
Developing software products is both a technical and a managerial challenge. The integration of these two areas (the logical/technical prescription of the process model with the resource-oriented planning and control of project management), however, still needs further discussion and clarification. We discuss the relation of the components of a software development process and their counterparts in project management. We also show how an integrated software engineering environment handles software process enactment based on both activities defined via a process model and on requirements resulting from project management.