{"title":"改进配电系统可靠性的案例研究","authors":"T. Branch","doi":"10.1109/PAPCON.2006.1673765","DOIUrl":null,"url":null,"abstract":"The paper presents a case study to show how Weyerhaeuser, Dryden Operations improved its power distribution system reliability. This paper focused mainly on the changes that were made on the 115 kV and 13.2 kV power distribution systems. The protection and synchronizing schemes were discussed, and the author shows how the addition of circuit switchers provided flexibility to perform maintenance on the incoming 115 kV/13.2 kV power transformers without interrupting mill operations","PeriodicalId":231751,"journal":{"name":"Conference Record of 2006 Annual Pulp and Paper Industry Technical Conference","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2006-06-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Weyerhaeuser, Dryden Operations Improved Power Distribution System Reliability A Case Study\",\"authors\":\"T. Branch\",\"doi\":\"10.1109/PAPCON.2006.1673765\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper presents a case study to show how Weyerhaeuser, Dryden Operations improved its power distribution system reliability. This paper focused mainly on the changes that were made on the 115 kV and 13.2 kV power distribution systems. The protection and synchronizing schemes were discussed, and the author shows how the addition of circuit switchers provided flexibility to perform maintenance on the incoming 115 kV/13.2 kV power transformers without interrupting mill operations\",\"PeriodicalId\":231751,\"journal\":{\"name\":\"Conference Record of 2006 Annual Pulp and Paper Industry Technical Conference\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-06-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Record of 2006 Annual Pulp and Paper Industry Technical Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PAPCON.2006.1673765\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record of 2006 Annual Pulp and Paper Industry Technical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAPCON.2006.1673765","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Weyerhaeuser, Dryden Operations Improved Power Distribution System Reliability A Case Study
The paper presents a case study to show how Weyerhaeuser, Dryden Operations improved its power distribution system reliability. This paper focused mainly on the changes that were made on the 115 kV and 13.2 kV power distribution systems. The protection and synchronizing schemes were discussed, and the author shows how the addition of circuit switchers provided flexibility to perform maintenance on the incoming 115 kV/13.2 kV power transformers without interrupting mill operations