{"title":"以平衡计分卡方法评估公营部门的资讯科技项目","authors":"N. Arshad, H. M. Idrus, F. Ahmad","doi":"10.1109/BEIAC.2012.6226043","DOIUrl":null,"url":null,"abstract":"Malaysian public sector is highly encouraged to utilize IT to improve their public services delivery to the public. Therefore, numerous IT projects have been approved and funded under several Malaysian National Plans. As the success of the existing or current IT projects in public sector are not properly evaluated has resulted in the same failures due to non-existence of a specific guideline, method or tool that can be used by public sector to evaluate their IT projects. This research aims at investigating the practice of IT project evaluation among the public sector agencies and analyzes how Malaysian public agencies evaluate their IT projects success or failure. A case study was conducted at one of the ministry as to seek data and information pertaining to the current practice of Malaysian government agencies in handling IT project evaluations. As anticipated, many project managers in public sector did not conduct IT projects evaluations. If it were conducted, most of the evaluations conducted improperly. The reasons why IT projects evaluation were not conducted properly were mainly because of the project managers did not have formal training and experience on IT projects evaluation and have not enough personnel to conduct IT projects evaluation. An IT project evaluation guideline has been developed, based on Balanced Scorecard and weighted scoring model, as a reference and guidance on conducting IT project evaluation.","PeriodicalId":404626,"journal":{"name":"2012 IEEE Business, Engineering & Industrial Applications Colloquium (BEIAC)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-04-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"A Balanced Scorecard approach in evaluating IT projects in the public sector\",\"authors\":\"N. Arshad, H. M. Idrus, F. Ahmad\",\"doi\":\"10.1109/BEIAC.2012.6226043\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Malaysian public sector is highly encouraged to utilize IT to improve their public services delivery to the public. Therefore, numerous IT projects have been approved and funded under several Malaysian National Plans. As the success of the existing or current IT projects in public sector are not properly evaluated has resulted in the same failures due to non-existence of a specific guideline, method or tool that can be used by public sector to evaluate their IT projects. This research aims at investigating the practice of IT project evaluation among the public sector agencies and analyzes how Malaysian public agencies evaluate their IT projects success or failure. A case study was conducted at one of the ministry as to seek data and information pertaining to the current practice of Malaysian government agencies in handling IT project evaluations. As anticipated, many project managers in public sector did not conduct IT projects evaluations. If it were conducted, most of the evaluations conducted improperly. The reasons why IT projects evaluation were not conducted properly were mainly because of the project managers did not have formal training and experience on IT projects evaluation and have not enough personnel to conduct IT projects evaluation. An IT project evaluation guideline has been developed, based on Balanced Scorecard and weighted scoring model, as a reference and guidance on conducting IT project evaluation.\",\"PeriodicalId\":404626,\"journal\":{\"name\":\"2012 IEEE Business, Engineering & Industrial Applications Colloquium (BEIAC)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-04-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 IEEE Business, Engineering & Industrial Applications Colloquium (BEIAC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/BEIAC.2012.6226043\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE Business, Engineering & Industrial Applications Colloquium (BEIAC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/BEIAC.2012.6226043","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

政府高度鼓励马来西亚公共部门利用资讯科技改善向公众提供的公共服务。因此,马来西亚的多个国家计划批准并资助了许多IT项目。由于公共机构现有或目前的资讯科技项目的成功没有得到适当的评估,导致同样的失败,因为没有一个具体的指导方针、方法或工具,可用于公共机构评估其资讯科技项目。本研究旨在调查公共部门机构中IT项目评估的实践,并分析马来西亚公共机构如何评估其IT项目的成功或失败。为了收集有关马来西亚政府机构在处理IT项目评估方面的现行做法的数据和信息,在其中一个部门进行了案例研究。正如预期的那样,许多公共部门的项目经理没有进行IT项目评估。即使进行了评估,大多数评估也进行得不恰当。IT项目评估不到位的主要原因是项目经理没有接受过正式的IT项目评估培训和经验,没有足够的人员进行IT项目评估。基于平衡计分卡和加权计分模型,制定了IT项目评估指南,作为开展IT项目评估的参考和指导。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Balanced Scorecard approach in evaluating IT projects in the public sector
Malaysian public sector is highly encouraged to utilize IT to improve their public services delivery to the public. Therefore, numerous IT projects have been approved and funded under several Malaysian National Plans. As the success of the existing or current IT projects in public sector are not properly evaluated has resulted in the same failures due to non-existence of a specific guideline, method or tool that can be used by public sector to evaluate their IT projects. This research aims at investigating the practice of IT project evaluation among the public sector agencies and analyzes how Malaysian public agencies evaluate their IT projects success or failure. A case study was conducted at one of the ministry as to seek data and information pertaining to the current practice of Malaysian government agencies in handling IT project evaluations. As anticipated, many project managers in public sector did not conduct IT projects evaluations. If it were conducted, most of the evaluations conducted improperly. The reasons why IT projects evaluation were not conducted properly were mainly because of the project managers did not have formal training and experience on IT projects evaluation and have not enough personnel to conduct IT projects evaluation. An IT project evaluation guideline has been developed, based on Balanced Scorecard and weighted scoring model, as a reference and guidance on conducting IT project evaluation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信