从坟墓到摇篮:拆迁垃圾管理的质量保证体系

M. Wijewickrama, N. Chileshe, R. Rameezdeen, J. J. Ochoa
{"title":"从坟墓到摇篮:拆迁垃圾管理的质量保证体系","authors":"M. Wijewickrama, N. Chileshe, R. Rameezdeen, J. J. Ochoa","doi":"10.31705/wcs.2023.43","DOIUrl":null,"url":null,"abstract":"The recent decade has witnessed significant demolition waste (DW) due to rapid urbanisation in many economies. Transforming from the traditional linear supply chains into a circular arrangement while thinking from ‘grave-to-cradle’ is a value-adding approach to managing DW effectively. Consequently, the concept of ‘reverse logistics supply chains (RLSC)’ has captured the attention of the construction industry. However, the poor quality of re-processed products has hindered the successful adoption of RLSC in the construction industry. Therefore, this study examines aspects of the quality assurance system needed for RLSC to manage DW effectively and efficiently. The study used a qualitative approach, including 20 semi-structured interviews with internal stakeholders of the RLSC of DW. The study empirically confirmed that the RLSC of DW should embrace an integrated system for QA, including four aspects: process, people, policy, and technology. Under process for QA, standard practices are to be undertaken separately during building dismantling and off-site waste processing stages. While people in RLSC are skilful, competent, licensed, supervised and monitored, internal and external organisational policies should also be available for QA. Besides, espousing traditional practices with innovative technologies is also imperative for QA in RLSC of DW. The study makes a significant contribution by empirically proving that an integrated system of process, people, policy and technology is needed for QA in RLSC of DW. The developed quality assurance system provides useful insights for industry practitioners about the aspects that they should embrace in enforcing QA throughout the transformation from ‘grave-to-cradle’ in the construction industry.","PeriodicalId":221447,"journal":{"name":"11th World Construction Symposium - 2023","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"From grave-to-cradle: quality assurance system for the demolition waste management\",\"authors\":\"M. Wijewickrama, N. Chileshe, R. Rameezdeen, J. J. Ochoa\",\"doi\":\"10.31705/wcs.2023.43\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The recent decade has witnessed significant demolition waste (DW) due to rapid urbanisation in many economies. Transforming from the traditional linear supply chains into a circular arrangement while thinking from ‘grave-to-cradle’ is a value-adding approach to managing DW effectively. Consequently, the concept of ‘reverse logistics supply chains (RLSC)’ has captured the attention of the construction industry. However, the poor quality of re-processed products has hindered the successful adoption of RLSC in the construction industry. Therefore, this study examines aspects of the quality assurance system needed for RLSC to manage DW effectively and efficiently. The study used a qualitative approach, including 20 semi-structured interviews with internal stakeholders of the RLSC of DW. The study empirically confirmed that the RLSC of DW should embrace an integrated system for QA, including four aspects: process, people, policy, and technology. Under process for QA, standard practices are to be undertaken separately during building dismantling and off-site waste processing stages. While people in RLSC are skilful, competent, licensed, supervised and monitored, internal and external organisational policies should also be available for QA. Besides, espousing traditional practices with innovative technologies is also imperative for QA in RLSC of DW. The study makes a significant contribution by empirically proving that an integrated system of process, people, policy and technology is needed for QA in RLSC of DW. The developed quality assurance system provides useful insights for industry practitioners about the aspects that they should embrace in enforcing QA throughout the transformation from ‘grave-to-cradle’ in the construction industry.\",\"PeriodicalId\":221447,\"journal\":{\"name\":\"11th World Construction Symposium - 2023\",\"volume\":\"14 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"11th World Construction Symposium - 2023\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31705/wcs.2023.43\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th World Construction Symposium - 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31705/wcs.2023.43","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

近十年来,由于许多经济体的快速城市化,出现了大量的拆迁垃圾。从传统的线性供应链转变为循环安排,同时从“坟墓到摇篮”思考,是有效管理DW的增值方法。因此,“逆向物流供应链(RLSC)”的概念引起了建筑行业的注意。然而,再加工产品的质量差阻碍了RLSC在建筑行业的成功采用。因此,本研究考察了RLSC有效和高效地管理DW所需的质量保证体系的各个方面。本研究采用定性方法,包括对DW RLSC内部利益相关者的20次半结构化访谈。实证研究证实了DW的RLSC应该包含一个集成的QA系统,包括四个方面:过程、人员、政策和技术。在质量保证过程中,在建筑物拆除和场外废物处理阶段分别进行标准操作。虽然RLSC的人员是熟练的,有能力的,有执照的,有监督和监控的,但内部和外部的组织政策也应该适用于QA。此外,在DW的RLSC中,支持传统实践和创新技术也是QA的必要条件。该研究通过实证证明了DW RLSC的质量保证需要一个过程、人员、政策和技术的集成系统,具有重要的贡献。已发展的质素保证体系,为从业员提供了有用的见解,让他们了解在建造业从“坟墓到摇篮”的转变过程中,在执行质素保证时,应采纳哪些方面。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
From grave-to-cradle: quality assurance system for the demolition waste management
The recent decade has witnessed significant demolition waste (DW) due to rapid urbanisation in many economies. Transforming from the traditional linear supply chains into a circular arrangement while thinking from ‘grave-to-cradle’ is a value-adding approach to managing DW effectively. Consequently, the concept of ‘reverse logistics supply chains (RLSC)’ has captured the attention of the construction industry. However, the poor quality of re-processed products has hindered the successful adoption of RLSC in the construction industry. Therefore, this study examines aspects of the quality assurance system needed for RLSC to manage DW effectively and efficiently. The study used a qualitative approach, including 20 semi-structured interviews with internal stakeholders of the RLSC of DW. The study empirically confirmed that the RLSC of DW should embrace an integrated system for QA, including four aspects: process, people, policy, and technology. Under process for QA, standard practices are to be undertaken separately during building dismantling and off-site waste processing stages. While people in RLSC are skilful, competent, licensed, supervised and monitored, internal and external organisational policies should also be available for QA. Besides, espousing traditional practices with innovative technologies is also imperative for QA in RLSC of DW. The study makes a significant contribution by empirically proving that an integrated system of process, people, policy and technology is needed for QA in RLSC of DW. The developed quality assurance system provides useful insights for industry practitioners about the aspects that they should embrace in enforcing QA throughout the transformation from ‘grave-to-cradle’ in the construction industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.40
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信