带有模式的程序待办事项描述:扩展神奇的待办事项模式集合

Lise B. Hvatum, R. Wirfs-Brock
{"title":"带有模式的程序待办事项描述:扩展神奇的待办事项模式集合","authors":"Lise B. Hvatum, R. Wirfs-Brock","doi":"10.1145/3282308.3282338","DOIUrl":null,"url":null,"abstract":"This paper extends our Magic Backlog Patterns collection with three additional patterns for managing the work of a program- or rather how to deal with coordinating the work of projects which are part of a larger program and where there may be dependencies and shared deployment. While teams within a program may work fairly independently, their work still needs to be coordinated to produce a product. These three patterns, which represent alternative strategies for structuring the backlog of work, are introduced through a story of the correspondence of a business analyst as her hypothetical program moves through different backlog management strategies.","PeriodicalId":136534,"journal":{"name":"Proceedings of the 23rd European Conference on Pattern Languages of Programs","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"A Program Backlog Story with Patterns: Expanding the Magic Backlog Pattern Collection\",\"authors\":\"Lise B. Hvatum, R. Wirfs-Brock\",\"doi\":\"10.1145/3282308.3282338\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper extends our Magic Backlog Patterns collection with three additional patterns for managing the work of a program- or rather how to deal with coordinating the work of projects which are part of a larger program and where there may be dependencies and shared deployment. While teams within a program may work fairly independently, their work still needs to be coordinated to produce a product. These three patterns, which represent alternative strategies for structuring the backlog of work, are introduced through a story of the correspondence of a business analyst as her hypothetical program moves through different backlog management strategies.\",\"PeriodicalId\":136534,\"journal\":{\"name\":\"Proceedings of the 23rd European Conference on Pattern Languages of Programs\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-07-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 23rd European Conference on Pattern Languages of Programs\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3282308.3282338\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 23rd European Conference on Pattern Languages of Programs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3282308.3282338","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文用三个额外的模式扩展了我们的Magic Backlog Patterns集合,这些模式用于管理一个项目的工作——或者更确切地说,是如何处理协调作为一个更大的项目的一部分的项目的工作,这些项目可能存在依赖关系和共享部署。虽然程序中的团队可以相当独立地工作,但他们的工作仍然需要协调以产生产品。这三种模式代表了构建工作积压的可选策略,它们是通过业务分析师的通信故事介绍的,因为她的假设程序在不同的积压管理策略中移动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Program Backlog Story with Patterns: Expanding the Magic Backlog Pattern Collection
This paper extends our Magic Backlog Patterns collection with three additional patterns for managing the work of a program- or rather how to deal with coordinating the work of projects which are part of a larger program and where there may be dependencies and shared deployment. While teams within a program may work fairly independently, their work still needs to be coordinated to produce a product. These three patterns, which represent alternative strategies for structuring the backlog of work, are introduced through a story of the correspondence of a business analyst as her hypothetical program moves through different backlog management strategies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信