规划干净的水管和脏水网络建设豪宅EXINDO group

Iqbal Askarin, S. Sutikno, Armin Naibaho
{"title":"规划干净的水管和脏水网络建设豪宅EXINDO group","authors":"Iqbal Askarin, S. Sutikno, Armin Naibaho","doi":"10.55404/jos-mrk.2021.02.03.287-291","DOIUrl":null,"url":null,"abstract":"In the construction of a building, a plan is needed in terms of structure, architecture and Mechanical Electrical and Plumbing (MEP) so that the functions and objectives of building construction run according to plans and needs. The purpose of this thesis is to meet the needs of clean water and plumbing installation needs in building construction. Guest House Exindo Group. In this plan, it takes data on planning drawings for plumbing installation projects as well as a list of unit prices for building materials and labor in the East Java region in 2020. The planning stages carried out for clean water and dirty water pipelines are determining the water installation scheme used, calculating the number of building occupants. , calculating the amount of water demand, calculating the capacity of ground water tanks and roof tanks, calculating IPAL and septic tanks and calculating the dimensions of the pipes used. From the results of this planning is obtained the number of room occupants as much as 401 people with clean water needs of 69.109 m3/ day, the volume of black water generated at 45.72 m3/ day, and the volume of grey water by 16.32 m3/ day. The dimensions of the clean water pipe are ½ inch – 2 inch, the dimensions of the hot water pipe are ½ inch – 1 ¼ inch, the dimensions of the dirty water pipe are 2 inch – 4 inch, and the dimensions of the hydrant pipe are 3 inch – 6 inch. The capacity of ground water tank is 25 m3, the capacity of roof tank is 12 m3, the capacity of hot water tank is 4 m3, the capacity of septic tank is 50 m3 and the IPAL’s capacity is 20 m3. Then the cost required for all installation work of clean water and black water systems for the construction of the Exindo Group Guest House Building is Rp 2.403.791.328.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PERENCANAAN JARINGAN PIPA AIR BERSIH DAN AIR KOTOR PEMBANGUNAN GEDUNG GUEST HOUSE EXINDO GRUP\",\"authors\":\"Iqbal Askarin, S. Sutikno, Armin Naibaho\",\"doi\":\"10.55404/jos-mrk.2021.02.03.287-291\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the construction of a building, a plan is needed in terms of structure, architecture and Mechanical Electrical and Plumbing (MEP) so that the functions and objectives of building construction run according to plans and needs. The purpose of this thesis is to meet the needs of clean water and plumbing installation needs in building construction. Guest House Exindo Group. In this plan, it takes data on planning drawings for plumbing installation projects as well as a list of unit prices for building materials and labor in the East Java region in 2020. The planning stages carried out for clean water and dirty water pipelines are determining the water installation scheme used, calculating the number of building occupants. , calculating the amount of water demand, calculating the capacity of ground water tanks and roof tanks, calculating IPAL and septic tanks and calculating the dimensions of the pipes used. From the results of this planning is obtained the number of room occupants as much as 401 people with clean water needs of 69.109 m3/ day, the volume of black water generated at 45.72 m3/ day, and the volume of grey water by 16.32 m3/ day. The dimensions of the clean water pipe are ½ inch – 2 inch, the dimensions of the hot water pipe are ½ inch – 1 ¼ inch, the dimensions of the dirty water pipe are 2 inch – 4 inch, and the dimensions of the hydrant pipe are 3 inch – 6 inch. The capacity of ground water tank is 25 m3, the capacity of roof tank is 12 m3, the capacity of hot water tank is 4 m3, the capacity of septic tank is 50 m3 and the IPAL’s capacity is 20 m3. Then the cost required for all installation work of clean water and black water systems for the construction of the Exindo Group Guest House Building is Rp 2.403.791.328.\",\"PeriodicalId\":337938,\"journal\":{\"name\":\"Jurnal JOS-MRK\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal JOS-MRK\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55404/jos-mrk.2021.02.03.287-291\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.287-291","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在建筑物的建造中,需要在结构,建筑和机电管道(MEP)方面制定计划,以便建筑物的功能和目标根据计划和需要运行。本文的目的是为了满足建筑施工中对净水和管道安装的需求。新都集团宾馆。在该计划中,它获取了2020年东爪哇地区管道安装项目规划图纸以及建筑材料和劳动力单价清单的数据。清洁水和脏水管道的规划阶段是确定所使用的水安装方案,计算建筑物的居住者人数。计算需水量,计算地下水箱和屋顶水箱的容量,计算IPAL和化粪池,计算所用管道的尺寸。根据规划结果,该项目可容纳401人,洁净水需求量为69.109 m3/天,黑水产生量为45.72 m3/天,灰水产生量为16.32 m3/天。清洁水管的尺寸为1 / 2英寸- 2英寸,热水管的尺寸为1 / 2英寸- 1 / 4英寸,脏水管的尺寸为2英寸- 4英寸,消火栓管的尺寸为3英寸- 6英寸。地下水箱容量25 m3,屋顶水箱容量12 m3,热水箱容量4 m3,化粪池容量50 m3, IPAL容量20 m3。那么新都集团招待所建筑的所有净水和黑水系统安装工程所需费用为Rp 2.403.791.328。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
PERENCANAAN JARINGAN PIPA AIR BERSIH DAN AIR KOTOR PEMBANGUNAN GEDUNG GUEST HOUSE EXINDO GRUP
In the construction of a building, a plan is needed in terms of structure, architecture and Mechanical Electrical and Plumbing (MEP) so that the functions and objectives of building construction run according to plans and needs. The purpose of this thesis is to meet the needs of clean water and plumbing installation needs in building construction. Guest House Exindo Group. In this plan, it takes data on planning drawings for plumbing installation projects as well as a list of unit prices for building materials and labor in the East Java region in 2020. The planning stages carried out for clean water and dirty water pipelines are determining the water installation scheme used, calculating the number of building occupants. , calculating the amount of water demand, calculating the capacity of ground water tanks and roof tanks, calculating IPAL and septic tanks and calculating the dimensions of the pipes used. From the results of this planning is obtained the number of room occupants as much as 401 people with clean water needs of 69.109 m3/ day, the volume of black water generated at 45.72 m3/ day, and the volume of grey water by 16.32 m3/ day. The dimensions of the clean water pipe are ½ inch – 2 inch, the dimensions of the hot water pipe are ½ inch – 1 ¼ inch, the dimensions of the dirty water pipe are 2 inch – 4 inch, and the dimensions of the hydrant pipe are 3 inch – 6 inch. The capacity of ground water tank is 25 m3, the capacity of roof tank is 12 m3, the capacity of hot water tank is 4 m3, the capacity of septic tank is 50 m3 and the IPAL’s capacity is 20 m3. Then the cost required for all installation work of clean water and black water systems for the construction of the Exindo Group Guest House Building is Rp 2.403.791.328.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信