{"title":"在以v.n.维诺格拉多娃命名的赛场上取得创纪录成绩的综合方法","authors":"S. Yakunin, E. Kashin, A. Shtyfel","doi":"10.2118/191519-18RPTC-MS","DOIUrl":null,"url":null,"abstract":"\n JS \"RITEK\" since 2008 engaged in the development of deposits named after V. N. Vinogradova. Geological oil reserves are more than 100 million tons of oil and are hard to recover reserves. Target horizon is AS3. Development of the field. V. N. Vinogradov was carried out in several stages. The first stage took place at the end of 2008 and involved the well re-entry and re-testing of exploration wells of the field. The next stage was the drilling of horizontal wells with multi-stage hydraulic fracturing. The horizontal wells have the standard design: direction Ø324 mm – 50 m, conductor Ø245 mm – 800 m, production casing Ø178 – 2000 m and a liner with a long horizontal section Ø114 mm – 500 m. Over the past few years the development of the field, the length of the horizontal section increased from 500 m to 1600 m. For the successful drilling of wells with horizontal section of 1600 metres was conducted the work on optimization of equipment, technologies and parameters of drilling a conductor casing string and the shank. The article presents technical and technological solutions for drilling optimization.","PeriodicalId":242965,"journal":{"name":"Day 2 Tue, October 16, 2018","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Comprehensive Approach to Achieve Record Performance on the field named after V. N. Vinogradova\",\"authors\":\"S. Yakunin, E. Kashin, A. Shtyfel\",\"doi\":\"10.2118/191519-18RPTC-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n JS \\\"RITEK\\\" since 2008 engaged in the development of deposits named after V. N. Vinogradova. Geological oil reserves are more than 100 million tons of oil and are hard to recover reserves. Target horizon is AS3. Development of the field. V. N. Vinogradov was carried out in several stages. The first stage took place at the end of 2008 and involved the well re-entry and re-testing of exploration wells of the field. The next stage was the drilling of horizontal wells with multi-stage hydraulic fracturing. The horizontal wells have the standard design: direction Ø324 mm – 50 m, conductor Ø245 mm – 800 m, production casing Ø178 – 2000 m and a liner with a long horizontal section Ø114 mm – 500 m. Over the past few years the development of the field, the length of the horizontal section increased from 500 m to 1600 m. For the successful drilling of wells with horizontal section of 1600 metres was conducted the work on optimization of equipment, technologies and parameters of drilling a conductor casing string and the shank. The article presents technical and technological solutions for drilling optimization.\",\"PeriodicalId\":242965,\"journal\":{\"name\":\"Day 2 Tue, October 16, 2018\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, October 16, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/191519-18RPTC-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, October 16, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/191519-18RPTC-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
JS“RITEK”自2008年以来从事以v.n. Vinogradova命名的矿床的开发。地质石油储量在1亿吨以上,是难以开采的储量。目标地平线AS3。领域的发展。v·n·维诺格拉多夫是分几个阶段实施的。第一阶段在2008年底进行,包括油田探井的回井和重新测试。下一阶段是水平井多级水力压裂钻井。水平井标准设计为:方向Ø324 mm ~ 50m,导管Ø245 mm ~ 800m,生产套管Ø178 ~ 2000m,尾管水平段Ø114 mm ~ 500m。经过几年来油田的开发,水平段的长度从500米增加到1600米。针对水平井段1600米的成功钻井,对钻取套管管柱和杆的设备、工艺和参数进行了优化。本文提出了钻井优化的技术和工艺解决方案。
A Comprehensive Approach to Achieve Record Performance on the field named after V. N. Vinogradova
JS "RITEK" since 2008 engaged in the development of deposits named after V. N. Vinogradova. Geological oil reserves are more than 100 million tons of oil and are hard to recover reserves. Target horizon is AS3. Development of the field. V. N. Vinogradov was carried out in several stages. The first stage took place at the end of 2008 and involved the well re-entry and re-testing of exploration wells of the field. The next stage was the drilling of horizontal wells with multi-stage hydraulic fracturing. The horizontal wells have the standard design: direction Ø324 mm – 50 m, conductor Ø245 mm – 800 m, production casing Ø178 – 2000 m and a liner with a long horizontal section Ø114 mm – 500 m. Over the past few years the development of the field, the length of the horizontal section increased from 500 m to 1600 m. For the successful drilling of wells with horizontal section of 1600 metres was conducted the work on optimization of equipment, technologies and parameters of drilling a conductor casing string and the shank. The article presents technical and technological solutions for drilling optimization.