嵌入式专家系统中不确定性管理的框架

J-D. Piques
{"title":"嵌入式专家系统中不确定性管理的框架","authors":"J-D. Piques","doi":"10.1109/DMESP.1991.171770","DOIUrl":null,"url":null,"abstract":"The uncertainty management system (UMS) shell and its management of uncertainty are described. UMS is an expert system building tool dedicated to real-time embedded applications. This system allows the user to specify knowledge using a set of linguistic approximations, without being conscious of data-processing internally performed. Supported by a development of the axioms of probability, an interval-based framework for managing uncertainty is presented. As generally admitted, an interval number is used to capture features of fuzziness and incompleteness. However, a new parameter, called the degree of dependency, is shown to be naturally induced by M.J. Frank's (1979) family of triangular norms.<<ETX>>","PeriodicalId":117336,"journal":{"name":"[1991] Proceedings of the IEEE/ACM International Conference on Developing and Managing Expert System Programs","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1991-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A framework for managing uncertainty in embedded expert systems\",\"authors\":\"J-D. Piques\",\"doi\":\"10.1109/DMESP.1991.171770\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The uncertainty management system (UMS) shell and its management of uncertainty are described. UMS is an expert system building tool dedicated to real-time embedded applications. This system allows the user to specify knowledge using a set of linguistic approximations, without being conscious of data-processing internally performed. Supported by a development of the axioms of probability, an interval-based framework for managing uncertainty is presented. As generally admitted, an interval number is used to capture features of fuzziness and incompleteness. However, a new parameter, called the degree of dependency, is shown to be naturally induced by M.J. Frank's (1979) family of triangular norms.<<ETX>>\",\"PeriodicalId\":117336,\"journal\":{\"name\":\"[1991] Proceedings of the IEEE/ACM International Conference on Developing and Managing Expert System Programs\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"[1991] Proceedings of the IEEE/ACM International Conference on Developing and Managing Expert System Programs\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DMESP.1991.171770\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"[1991] Proceedings of the IEEE/ACM International Conference on Developing and Managing Expert System Programs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DMESP.1991.171770","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

介绍了不确定度管理系统(UMS)的外壳及其对不确定度的管理。UMS是一个专门用于实时嵌入式应用的专家系统构建工具。该系统允许用户使用一组语言近似来指定知识,而无需意识到内部执行的数据处理。在概率公理发展的支持下,提出了一种基于区间的不确定性管理框架。一般认为,区间数是用来捕捉模糊性和不完备性特征的。然而,一个新的参数,称为依赖程度,被证明是由M.J. Frank(1979)的三角范数族自然产生的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A framework for managing uncertainty in embedded expert systems
The uncertainty management system (UMS) shell and its management of uncertainty are described. UMS is an expert system building tool dedicated to real-time embedded applications. This system allows the user to specify knowledge using a set of linguistic approximations, without being conscious of data-processing internally performed. Supported by a development of the axioms of probability, an interval-based framework for managing uncertainty is presented. As generally admitted, an interval number is used to capture features of fuzziness and incompleteness. However, a new parameter, called the degree of dependency, is shown to be naturally induced by M.J. Frank's (1979) family of triangular norms.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信