{"title":"单极自合闸在中压配电网中的应用,提高分布式发电的集成度","authors":"M. Figueroa, E. Orduña","doi":"10.1109/TDCLA.2006.311508","DOIUrl":null,"url":null,"abstract":"This paper is divided into three parts. The first part presents a bibliographical survey about the advances to date in the area of protection of medium voltage (MV) distribution networks with distributed generation (DG). The second part discusses the transient stability of distributed synchronous generators, and the application of single pole auto-reclosing (SPAR) scheme in MV distribution networks. In the third part of this paper, dynamic simulation studies are performed and presented in order to evaluate transient stability of DG during three-phase and single-phase-to-ground faults. Additionally, results of simulation of the SPAR scheme applications on a MV distribution network with DG are presented. For this investigation, a MV test feeder with DG units has been used, and studies have been performed based on a digital computer simulation approach","PeriodicalId":406067,"journal":{"name":"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Application of Single Pole Auto-Reclosing in Medium Voltage Distribution Networks for Improving Integration of Distributed Generation\",\"authors\":\"M. Figueroa, E. Orduña\",\"doi\":\"10.1109/TDCLA.2006.311508\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper is divided into three parts. The first part presents a bibliographical survey about the advances to date in the area of protection of medium voltage (MV) distribution networks with distributed generation (DG). The second part discusses the transient stability of distributed synchronous generators, and the application of single pole auto-reclosing (SPAR) scheme in MV distribution networks. In the third part of this paper, dynamic simulation studies are performed and presented in order to evaluate transient stability of DG during three-phase and single-phase-to-ground faults. Additionally, results of simulation of the SPAR scheme applications on a MV distribution network with DG are presented. For this investigation, a MV test feeder with DG units has been used, and studies have been performed based on a digital computer simulation approach\",\"PeriodicalId\":406067,\"journal\":{\"name\":\"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDCLA.2006.311508\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLA.2006.311508","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

本文共分为三个部分。第一部分介绍了分布式电源保护中压配电网的文献综述。第二部分讨论了分布式同步发电机的暂态稳定性,以及单极自合闸(SPAR)方案在中压配电网中的应用。在本文的第三部分,进行了动态仿真研究,以评估三相和单相接地故障时DG的暂态稳定性。最后给出了SPAR方案在中压DG配电网中的应用仿真结果。在这项研究中,使用了带有DG单元的中压测试馈线,并基于数字计算机模拟方法进行了研究
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Application of Single Pole Auto-Reclosing in Medium Voltage Distribution Networks for Improving Integration of Distributed Generation
This paper is divided into three parts. The first part presents a bibliographical survey about the advances to date in the area of protection of medium voltage (MV) distribution networks with distributed generation (DG). The second part discusses the transient stability of distributed synchronous generators, and the application of single pole auto-reclosing (SPAR) scheme in MV distribution networks. In the third part of this paper, dynamic simulation studies are performed and presented in order to evaluate transient stability of DG during three-phase and single-phase-to-ground faults. Additionally, results of simulation of the SPAR scheme applications on a MV distribution network with DG are presented. For this investigation, a MV test feeder with DG units has been used, and studies have been performed based on a digital computer simulation approach
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信