考虑维护和交易计划灵活性的长期单位承诺

Yuanjing Li, Jingxiao Jiang, Yueshuang Bao, Xinyuan Liu, Ying Wang, Kaifeng Zhang
{"title":"考虑维护和交易计划灵活性的长期单位承诺","authors":"Yuanjing Li, Jingxiao Jiang, Yueshuang Bao, Xinyuan Liu, Ying Wang, Kaifeng Zhang","doi":"10.1109/REPE52765.2021.9617006","DOIUrl":null,"url":null,"abstract":"In recent years, with the rapid development of power market, higher requirements are put forward for the coordination of long-term unit commitment scheduling and maintenance plan. In a meanwhile, trading planning and maintenance planning are two interrelated and coupled applications, and the joint optimization between them should be considered and studied. In this paper, a long-term unit commitment model simultaneously adding the constrains of unit maintenance and trading plan is established, with their flexibility taken into consideration. Then, in order to solve the problem of complex and large-scale calculation in long-term unit commitment scheduling, this paper proposes a peak-valley load based model. After that, based on a 6-bus system, the simulation experiment is carried out, and the effects of maintenance and trading plan on unit commitment scheduling and unit output is analyzed. The simulation results verify the effectiveness of the proposed model.","PeriodicalId":136285,"journal":{"name":"2021 IEEE 4th International Conference on Renewable Energy and Power Engineering (REPE)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-10-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Long-term Unit Commitment Considering the Flexibility of Maintenance and Trading Plan\",\"authors\":\"Yuanjing Li, Jingxiao Jiang, Yueshuang Bao, Xinyuan Liu, Ying Wang, Kaifeng Zhang\",\"doi\":\"10.1109/REPE52765.2021.9617006\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In recent years, with the rapid development of power market, higher requirements are put forward for the coordination of long-term unit commitment scheduling and maintenance plan. In a meanwhile, trading planning and maintenance planning are two interrelated and coupled applications, and the joint optimization between them should be considered and studied. In this paper, a long-term unit commitment model simultaneously adding the constrains of unit maintenance and trading plan is established, with their flexibility taken into consideration. Then, in order to solve the problem of complex and large-scale calculation in long-term unit commitment scheduling, this paper proposes a peak-valley load based model. After that, based on a 6-bus system, the simulation experiment is carried out, and the effects of maintenance and trading plan on unit commitment scheduling and unit output is analyzed. The simulation results verify the effectiveness of the proposed model.\",\"PeriodicalId\":136285,\"journal\":{\"name\":\"2021 IEEE 4th International Conference on Renewable Energy and Power Engineering (REPE)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 IEEE 4th International Conference on Renewable Energy and Power Engineering (REPE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/REPE52765.2021.9617006\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE 4th International Conference on Renewable Energy and Power Engineering (REPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REPE52765.2021.9617006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

近年来,随着电力市场的快速发展,对机组长期投入调度与维护计划的协调提出了更高的要求。同时,交易计划和维修计划是两个相互关联、耦合的应用,需要考虑和研究它们之间的联合优化。本文考虑机组维护约束和交易计划约束的灵活性,建立了同时考虑机组维护约束和交易计划约束的机组长期承诺模型。然后,为了解决长期机组承诺调度中复杂、大规模的计算问题,本文提出了一种基于峰谷负荷的模型。在此基础上,基于6总线系统进行了仿真实验,分析了维护和交易计划对机组承诺调度和机组输出的影响。仿真结果验证了该模型的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Long-term Unit Commitment Considering the Flexibility of Maintenance and Trading Plan
In recent years, with the rapid development of power market, higher requirements are put forward for the coordination of long-term unit commitment scheduling and maintenance plan. In a meanwhile, trading planning and maintenance planning are two interrelated and coupled applications, and the joint optimization between them should be considered and studied. In this paper, a long-term unit commitment model simultaneously adding the constrains of unit maintenance and trading plan is established, with their flexibility taken into consideration. Then, in order to solve the problem of complex and large-scale calculation in long-term unit commitment scheduling, this paper proposes a peak-valley load based model. After that, based on a 6-bus system, the simulation experiment is carried out, and the effects of maintenance and trading plan on unit commitment scheduling and unit output is analyzed. The simulation results verify the effectiveness of the proposed model.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信