扩展制造环境下的排程替代方法分析

A. Santos, M. Varela, G. Putnik, A. Madureira
{"title":"扩展制造环境下的排程替代方法分析","authors":"A. Santos, M. Varela, G. Putnik, A. Madureira","doi":"10.1109/NaBIC.2014.6921860","DOIUrl":null,"url":null,"abstract":"Extended Manufacturing Environments (EMEs) are nowadays growing due to the increase on Distributed and Virtual Enterprises, which led to an emergent need to apply scheduling approaches accordingly. This can be achieved in several different ways, namely by putting forward new approaches or by trying to adapt existing ones. In this paper the adaptation of some existing scheduling methods is proposed for solving a two stage manufacturing scheduling problem, and an illustrative example is presented. Several approaches were analyses, namely through the use of the ANOVA and the Post Hoc Scheffe's test, that demonstrated the superior performance of one of the proposed methods.","PeriodicalId":209716,"journal":{"name":"2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC 2014)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2014-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"Alternative approaches analysis for scheduling in an Extended Manufacturing Environment\",\"authors\":\"A. Santos, M. Varela, G. Putnik, A. Madureira\",\"doi\":\"10.1109/NaBIC.2014.6921860\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Extended Manufacturing Environments (EMEs) are nowadays growing due to the increase on Distributed and Virtual Enterprises, which led to an emergent need to apply scheduling approaches accordingly. This can be achieved in several different ways, namely by putting forward new approaches or by trying to adapt existing ones. In this paper the adaptation of some existing scheduling methods is proposed for solving a two stage manufacturing scheduling problem, and an illustrative example is presented. Several approaches were analyses, namely through the use of the ANOVA and the Post Hoc Scheffe's test, that demonstrated the superior performance of one of the proposed methods.\",\"PeriodicalId\":209716,\"journal\":{\"name\":\"2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC 2014)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-10-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC 2014)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/NaBIC.2014.6921860\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC 2014)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NaBIC.2014.6921860","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

摘要

如今,由于分布式和虚拟企业的增加,扩展制造环境(EMEs)也在不断发展,这就迫切需要相应的调度方法。这可以通过几种不同的方式来实现,即提出新方法或尝试调整现有方法。本文提出了一些现有调度方法的调整方案,用于解决两阶段生产调度问题,并给出了一个示例。分析了几种方法,即通过使用方差分析和Post Hoc Scheffe's检验,证明了其中一种建议方法的优越性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Alternative approaches analysis for scheduling in an Extended Manufacturing Environment
Extended Manufacturing Environments (EMEs) are nowadays growing due to the increase on Distributed and Virtual Enterprises, which led to an emergent need to apply scheduling approaches accordingly. This can be achieved in several different ways, namely by putting forward new approaches or by trying to adapt existing ones. In this paper the adaptation of some existing scheduling methods is proposed for solving a two stage manufacturing scheduling problem, and an illustrative example is presented. Several approaches were analyses, namely through the use of the ANOVA and the Post Hoc Scheffe's test, that demonstrated the superior performance of one of the proposed methods.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信