Butwal和Shivapur公路区划下基于工程类型和规模的合同投标趋势

A. Mishra
{"title":"Butwal和Shivapur公路区划下基于工程类型和规模的合同投标趋势","authors":"A. Mishra","doi":"10.24321/2456.9925.201905","DOIUrl":null,"url":null,"abstract":"The Purpose of the research is to analyze the existing bidding trends & relation between number of bidders, estimated amount with three types and three sizes of projects at Road Division Butwal and Shivapur. Bidding data of four consecutive fiscal years starting from 072/73 of two Road Divisions were analyzed. Low bidding trend was identified in overall using average percentage below as threshold and analysis was also done using average number of bidders for competitive bids. Research revealed that 34.58, 19.81 & 29.53 % below engineer’s estimate in Butwal and 25.71, 26.67 & 23.50 % below were found in Shivapur Division respectively for general road works, structural works & maintenance works and also the threshold for low bids. Similarly, average number of bidders only 40%, 36% bids was found as competitive bids, whereas 60% & 53.44% bids were low bids respectively in Butwal and Shivapur Divisions.Likewise 24.17, 34.77 & 31 % below and 25.15, 24.72, 27.5% below were found for Size 1, Size 2, Size 3 of Butwal & Shivapur respectively. Maximum number of contracts was found at 20-35% below for both divisions. Significant effect of number of bidder is seen in low bidding. Improvement in existing bid awarding system with extra qualification criteria should be focused by assigning weight in monitory term, asking method of statement and assurancefor project performances of project before implementation. This research would be useful for those who are involving in policy making and governing agencies like Public Procurement Monitoring Office and for making necessary amendment in existing rules. \nHow to cite this article: Bahadur KCM, Mishra AK. Bidding Trends of Contracts based on Types and Sizes of Projects under Road Divisions Butwal and Shivapur. J Adv Res Const Urban Arch 2019; 4(3&4): 7-16. \nDOI: https://doi.org/10.24321/2456.9925.201905","PeriodicalId":267306,"journal":{"name":"Journal of Advanced Research in Construction and Urban Architecture","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Bidding Trends of Contracts based on Types and Sizes of Projects under Road Divisions Butwal and Shivapur\",\"authors\":\"A. Mishra\",\"doi\":\"10.24321/2456.9925.201905\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Purpose of the research is to analyze the existing bidding trends & relation between number of bidders, estimated amount with three types and three sizes of projects at Road Division Butwal and Shivapur. Bidding data of four consecutive fiscal years starting from 072/73 of two Road Divisions were analyzed. Low bidding trend was identified in overall using average percentage below as threshold and analysis was also done using average number of bidders for competitive bids. Research revealed that 34.58, 19.81 & 29.53 % below engineer’s estimate in Butwal and 25.71, 26.67 & 23.50 % below were found in Shivapur Division respectively for general road works, structural works & maintenance works and also the threshold for low bids. Similarly, average number of bidders only 40%, 36% bids was found as competitive bids, whereas 60% & 53.44% bids were low bids respectively in Butwal and Shivapur Divisions.Likewise 24.17, 34.77 & 31 % below and 25.15, 24.72, 27.5% below were found for Size 1, Size 2, Size 3 of Butwal & Shivapur respectively. Maximum number of contracts was found at 20-35% below for both divisions. Significant effect of number of bidder is seen in low bidding. Improvement in existing bid awarding system with extra qualification criteria should be focused by assigning weight in monitory term, asking method of statement and assurancefor project performances of project before implementation. This research would be useful for those who are involving in policy making and governing agencies like Public Procurement Monitoring Office and for making necessary amendment in existing rules. \\nHow to cite this article: Bahadur KCM, Mishra AK. Bidding Trends of Contracts based on Types and Sizes of Projects under Road Divisions Butwal and Shivapur. J Adv Res Const Urban Arch 2019; 4(3&4): 7-16. \\nDOI: https://doi.org/10.24321/2456.9925.201905\",\"PeriodicalId\":267306,\"journal\":{\"name\":\"Journal of Advanced Research in Construction and Urban Architecture\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-08-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Advanced Research in Construction and Urban Architecture\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24321/2456.9925.201905\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Advanced Research in Construction and Urban Architecture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24321/2456.9925.201905","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

本研究的目的是分析在Butwal和Shivapur路段,三种类型和三种规模的项目的投标人数和预估金额之间的现有投标趋势和关系。分析了两个路司从072/73开始连续四个会计年度的招标数据。使用低于平均百分比作为阈值,总体上确定了低投标趋势,并使用竞争性投标的平均投标人数量进行了分析。研究显示,在Butwal和Shivapur地区,一般道路工程、结构工程和维护工程以及低出价的门槛分别比工程师的估计低34.58%、19.81%和29.53%,比工程师的估计低25.71%、26.67%和23.50%。同样,投标人的平均数量只有40%和36%的投标是竞争性投标,而在Butwal和Shivapur地区,分别有60%和53.44%的投标是低价投标。同样,Butwal和Shivapur的1号、2号、3号分别低于24.17%、34.77%和31%,低于25.15%、24.72%和27.5%。两个部门的最大合同数量都低于20-35%。投标人数量对低出价的影响显著。对现有的附加资格标准的评标制度的改进,应从监测期的权重分配、项目实施前对项目绩效的陈述方法和保证等方面入手。这项研究对那些参与政策制定和公共采购监测办公室等管理机构的人以及对现有规则进行必要修正的人是有用的。如何引用这篇文章:Bahadur KCM, Mishra AK。Butwal和Shivapur公路区划下基于工程类型和规模的合同投标趋势J Adv Res Const Urban Arch 2019;4(3和4):7 - 16。DOI: https://doi.org/10.24321/2456.9925.201905
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Bidding Trends of Contracts based on Types and Sizes of Projects under Road Divisions Butwal and Shivapur
The Purpose of the research is to analyze the existing bidding trends & relation between number of bidders, estimated amount with three types and three sizes of projects at Road Division Butwal and Shivapur. Bidding data of four consecutive fiscal years starting from 072/73 of two Road Divisions were analyzed. Low bidding trend was identified in overall using average percentage below as threshold and analysis was also done using average number of bidders for competitive bids. Research revealed that 34.58, 19.81 & 29.53 % below engineer’s estimate in Butwal and 25.71, 26.67 & 23.50 % below were found in Shivapur Division respectively for general road works, structural works & maintenance works and also the threshold for low bids. Similarly, average number of bidders only 40%, 36% bids was found as competitive bids, whereas 60% & 53.44% bids were low bids respectively in Butwal and Shivapur Divisions.Likewise 24.17, 34.77 & 31 % below and 25.15, 24.72, 27.5% below were found for Size 1, Size 2, Size 3 of Butwal & Shivapur respectively. Maximum number of contracts was found at 20-35% below for both divisions. Significant effect of number of bidder is seen in low bidding. Improvement in existing bid awarding system with extra qualification criteria should be focused by assigning weight in monitory term, asking method of statement and assurancefor project performances of project before implementation. This research would be useful for those who are involving in policy making and governing agencies like Public Procurement Monitoring Office and for making necessary amendment in existing rules. How to cite this article: Bahadur KCM, Mishra AK. Bidding Trends of Contracts based on Types and Sizes of Projects under Road Divisions Butwal and Shivapur. J Adv Res Const Urban Arch 2019; 4(3&4): 7-16. DOI: https://doi.org/10.24321/2456.9925.201905
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信