{"title":"桩-筏复合地基:周土(冲积土)的可持续选择","authors":"Devesh Ojha","doi":"10.54060/jmce/001.01.004","DOIUrl":null,"url":null,"abstract":"There are no standards and no design rules for Combined Piled-Raft Foundation available up to now. A preliminary stage and a final stage are involved in the construction of a piled raft base. The preliminary design stage includes determining the critical parameters, such as the number of piles, their diameter, and length, as well as the Es value of the subsoil strata, in order to establish an optimal design that can achieve the necessary settlement reduction. Precision and accuracy of the current design strategies is calculated by in-situ parameters such as Es, despite that, the computational effort and time do not justify their use for preliminary studies that may require.","PeriodicalId":142002,"journal":{"name":"Journal of Mechanical and Construction Engineering (JMCE)","volume":"93 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Combined Piled-Raft Foundation a Sustainable Option for Week Soil (Alluvial Soil)\",\"authors\":\"Devesh Ojha\",\"doi\":\"10.54060/jmce/001.01.004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"There are no standards and no design rules for Combined Piled-Raft Foundation available up to now. A preliminary stage and a final stage are involved in the construction of a piled raft base. The preliminary design stage includes determining the critical parameters, such as the number of piles, their diameter, and length, as well as the Es value of the subsoil strata, in order to establish an optimal design that can achieve the necessary settlement reduction. Precision and accuracy of the current design strategies is calculated by in-situ parameters such as Es, despite that, the computational effort and time do not justify their use for preliminary studies that may require.\",\"PeriodicalId\":142002,\"journal\":{\"name\":\"Journal of Mechanical and Construction Engineering (JMCE)\",\"volume\":\"93 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-04-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Mechanical and Construction Engineering (JMCE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54060/jmce/001.01.004\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Mechanical and Construction Engineering (JMCE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54060/jmce/001.01.004","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

桩筏组合基础目前尚无相关标准和设计规范。桩筏基础的施工分为初始阶段和最终阶段。初步设计阶段包括确定桩数、桩径、桩长等关键参数,以及地基地层Es值,以建立最优设计,实现必要的沉降减少。当前设计策略的精度和准确性是通过e等原位参数计算的,尽管如此,计算的工作量和时间不足以证明它们用于可能需要的初步研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Combined Piled-Raft Foundation a Sustainable Option for Week Soil (Alluvial Soil)
There are no standards and no design rules for Combined Piled-Raft Foundation available up to now. A preliminary stage and a final stage are involved in the construction of a piled raft base. The preliminary design stage includes determining the critical parameters, such as the number of piles, their diameter, and length, as well as the Es value of the subsoil strata, in order to establish an optimal design that can achieve the necessary settlement reduction. Precision and accuracy of the current design strategies is calculated by in-situ parameters such as Es, despite that, the computational effort and time do not justify their use for preliminary studies that may require.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信