{"title":"基于Z母线矩阵潮流跟踪的输电费用分配","authors":"S. Kilyeni, O. Pop, G. Proștean, C. Craciun","doi":"10.1109/ICHQP.2010.5625428","DOIUrl":null,"url":null,"abstract":"The authors are proposing a transmission cost allocation method, using the real and reactive power flow tracing. It is based on Z bus system matrix. The real and reactive power losses are considered. The case study refers to the 12 buses test power system, heaving 6 P-U buses and 6 P-Q buses. The comparison is performed for neglecting and considering the transversal conductance.","PeriodicalId":180078,"journal":{"name":"Proceedings of 14th International Conference on Harmonics and Quality of Power - ICHQP 2010","volume":"141 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":"{\"title\":\"Transmission cost allocation based on power flow tracing using Z bus matrix\",\"authors\":\"S. Kilyeni, O. Pop, G. Proștean, C. Craciun\",\"doi\":\"10.1109/ICHQP.2010.5625428\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The authors are proposing a transmission cost allocation method, using the real and reactive power flow tracing. It is based on Z bus system matrix. The real and reactive power losses are considered. The case study refers to the 12 buses test power system, heaving 6 P-U buses and 6 P-Q buses. The comparison is performed for neglecting and considering the transversal conductance.\",\"PeriodicalId\":180078,\"journal\":{\"name\":\"Proceedings of 14th International Conference on Harmonics and Quality of Power - ICHQP 2010\",\"volume\":\"141 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-11-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"11\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of 14th International Conference on Harmonics and Quality of Power - ICHQP 2010\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICHQP.2010.5625428\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 14th International Conference on Harmonics and Quality of Power - ICHQP 2010","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICHQP.2010.5625428","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

摘要

作者提出了一种采用实数潮流和无功潮流跟踪的输电费用分摊方法。它基于Z总线系统矩阵。考虑了实际和无功功率损耗。本案例为12母线测试电源系统,包含6条P-U母线和6条P-Q母线。在忽略和考虑横向电导的情况下进行了比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Transmission cost allocation based on power flow tracing using Z bus matrix
The authors are proposing a transmission cost allocation method, using the real and reactive power flow tracing. It is based on Z bus system matrix. The real and reactive power losses are considered. The case study refers to the 12 buses test power system, heaving 6 P-U buses and 6 P-Q buses. The comparison is performed for neglecting and considering the transversal conductance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信