{"title":"将现有的138千伏输电塔改造为230千伏容量","authors":"B. Wood, T. L. Moore","doi":"10.1109/TDC.2006.1668663","DOIUrl":null,"url":null,"abstract":"In order to satisfy growing electrical demand in the San Diego, California area, San Diego Gas and Electric Company (SDG&E) is modifying existing transmission towers to maximize right of way utilization. Recent projects include modifying existing 138-kV towers to 230-kV capacity. Design considerations including construction methods, and electrical and structural requirements are discussed","PeriodicalId":123024,"journal":{"name":"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition","volume":"120 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Modifying Existing 138-kV Transmission Towers to 230-kV Capacity\",\"authors\":\"B. Wood, T. L. Moore\",\"doi\":\"10.1109/TDC.2006.1668663\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to satisfy growing electrical demand in the San Diego, California area, San Diego Gas and Electric Company (SDG&E) is modifying existing transmission towers to maximize right of way utilization. Recent projects include modifying existing 138-kV towers to 230-kV capacity. Design considerations including construction methods, and electrical and structural requirements are discussed\",\"PeriodicalId\":123024,\"journal\":{\"name\":\"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition\",\"volume\":\"120 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2006.1668663\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2006.1668663","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Modifying Existing 138-kV Transmission Towers to 230-kV Capacity
In order to satisfy growing electrical demand in the San Diego, California area, San Diego Gas and Electric Company (SDG&E) is modifying existing transmission towers to maximize right of way utilization. Recent projects include modifying existing 138-kV towers to 230-kV capacity. Design considerations including construction methods, and electrical and structural requirements are discussed