带故障限流器的配电网过流保护协调

J. Kumara, A. Atputharajah, J. Ekanayake, F. Mumford
{"title":"带故障限流器的配电网过流保护协调","authors":"J. Kumara, A. Atputharajah, J. Ekanayake, F. Mumford","doi":"10.1109/PES.2006.1709251","DOIUrl":null,"url":null,"abstract":"The connection of new distributed generator (DG) to the existing network increases the fault current and disturbs the existing over current (O/C) protection coordination. The main focus of this study was to investigate the possibility of using a fault current limiter (FCL) to address the above issues. A case study was carried out for a 20 kV distribution network in interactive power system analysis (IPSA) simulation package. Connection of a DG to the considered network increases the fault current closer to the rating of two switchgears and disturbs the O/C protection coordination. An FCL is introduced and varies its impedance and location of installation to investigate the limiting capability and effect on protection coordination. The modifications required to O/C protection scheme for proper coordination were also investigated. The study proved that when locating the FCL near the DG, it limits the fault current while minimizing the problems associated with the protection","PeriodicalId":267582,"journal":{"name":"2006 IEEE Power Engineering Society General Meeting","volume":"535 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"51","resultStr":"{\"title\":\"Over current protection coordination of distribution networks with fault current limiters\",\"authors\":\"J. Kumara, A. Atputharajah, J. Ekanayake, F. Mumford\",\"doi\":\"10.1109/PES.2006.1709251\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The connection of new distributed generator (DG) to the existing network increases the fault current and disturbs the existing over current (O/C) protection coordination. The main focus of this study was to investigate the possibility of using a fault current limiter (FCL) to address the above issues. A case study was carried out for a 20 kV distribution network in interactive power system analysis (IPSA) simulation package. Connection of a DG to the considered network increases the fault current closer to the rating of two switchgears and disturbs the O/C protection coordination. An FCL is introduced and varies its impedance and location of installation to investigate the limiting capability and effect on protection coordination. The modifications required to O/C protection scheme for proper coordination were also investigated. The study proved that when locating the FCL near the DG, it limits the fault current while minimizing the problems associated with the protection\",\"PeriodicalId\":267582,\"journal\":{\"name\":\"2006 IEEE Power Engineering Society General Meeting\",\"volume\":\"535 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-10-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"51\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 IEEE Power Engineering Society General Meeting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PES.2006.1709251\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE Power Engineering Society General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2006.1709251","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 51

摘要

新DG接入既有电网,增加了故障电流,扰乱了既有过流保护协调。本研究的主要重点是研究使用故障限流器(FCL)来解决上述问题的可能性。以某20kv配电网为例,在交互式电力系统分析(IPSA)仿真软件包中进行了仿真研究。将DG接入所考虑的网络,使故障电流更接近两个开关设备的额定值,并扰乱O/C保护协调。介绍了一种FCL,通过改变FCL的阻抗和安装位置,研究了FCL的限流能力及其对保护协调的影响。还研究了对O/C保护方案进行适当协调所需的修改。研究证明,当将FCL定位在DG附近时,它可以限制故障电流,同时最大限度地减少与保护相关的问题
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Over current protection coordination of distribution networks with fault current limiters
The connection of new distributed generator (DG) to the existing network increases the fault current and disturbs the existing over current (O/C) protection coordination. The main focus of this study was to investigate the possibility of using a fault current limiter (FCL) to address the above issues. A case study was carried out for a 20 kV distribution network in interactive power system analysis (IPSA) simulation package. Connection of a DG to the considered network increases the fault current closer to the rating of two switchgears and disturbs the O/C protection coordination. An FCL is introduced and varies its impedance and location of installation to investigate the limiting capability and effect on protection coordination. The modifications required to O/C protection scheme for proper coordination were also investigated. The study proved that when locating the FCL near the DG, it limits the fault current while minimizing the problems associated with the protection
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信