建筑项目采用绿色供应链管理的障碍

B. Amade, Abiola Adeniyi Adeyomo, A. Ogbonna, Ogaga Linus Okore, I. Okwara
{"title":"建筑项目采用绿色供应链管理的障碍","authors":"B. Amade, Abiola Adeniyi Adeyomo, A. Ogbonna, Ogaga Linus Okore, I. Okwara","doi":"10.18485/epmj.2020.10.2.5","DOIUrl":null,"url":null,"abstract":": The purpose of this paper is to explore barriers to green supply chain management (GSCM) implementation in the Nigerian construction industry with a view to providing a sustainable environmental friendliness and green construction practice. The research approach deployed for this study includes targeting purposively selected construction firms that are involved in GSCM in construction related projects in Imo State, Nigeria. A questionnaire survey was deployed amongst a sample of construction firms. Barriers to GSCM implementation were identified via an extensive literature review. Specifically, data for the study was acquired via questionnaires from relevant industry practitioners. The study was limited to construction firms that are involved in GSCM related activities within Imo State which is located within the high construction /‘Niger Delta’ hub of Nigeria. With the limited nature of the study in terms of geographic coverage, the results from this study can be extrapolated to cover other parts of the country. The findings revealed that barriers to GSCM implementation were mostly lack of knowledge and experience which headed the list of barriers as stated by the respondents. This is followed in that order by lack of top management support, cost of implementing GSCM, lack of government regulations and support systems amongst others were ascertained to be obstacles to GSCM implementation in Imo State. The study concludes by recommending that a more detailed analysis be carried out with a view to building the capacity of practitioners in GSCM pursuant to better construction project performance.","PeriodicalId":371624,"journal":{"name":"European Project Management Journal","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Barriers to Green Supply Chain Management (GSCM) Adoption on Construction Projects\",\"authors\":\"B. Amade, Abiola Adeniyi Adeyomo, A. Ogbonna, Ogaga Linus Okore, I. Okwara\",\"doi\":\"10.18485/epmj.2020.10.2.5\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": The purpose of this paper is to explore barriers to green supply chain management (GSCM) implementation in the Nigerian construction industry with a view to providing a sustainable environmental friendliness and green construction practice. The research approach deployed for this study includes targeting purposively selected construction firms that are involved in GSCM in construction related projects in Imo State, Nigeria. A questionnaire survey was deployed amongst a sample of construction firms. Barriers to GSCM implementation were identified via an extensive literature review. Specifically, data for the study was acquired via questionnaires from relevant industry practitioners. The study was limited to construction firms that are involved in GSCM related activities within Imo State which is located within the high construction /‘Niger Delta’ hub of Nigeria. With the limited nature of the study in terms of geographic coverage, the results from this study can be extrapolated to cover other parts of the country. The findings revealed that barriers to GSCM implementation were mostly lack of knowledge and experience which headed the list of barriers as stated by the respondents. This is followed in that order by lack of top management support, cost of implementing GSCM, lack of government regulations and support systems amongst others were ascertained to be obstacles to GSCM implementation in Imo State. The study concludes by recommending that a more detailed analysis be carried out with a view to building the capacity of practitioners in GSCM pursuant to better construction project performance.\",\"PeriodicalId\":371624,\"journal\":{\"name\":\"European Project Management Journal\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"European Project Management Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18485/epmj.2020.10.2.5\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Project Management Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18485/epmj.2020.10.2.5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

本文的目的是探讨尼日利亚建筑业实施绿色供应链管理(GSCM)的障碍,以期提供可持续的环境友好和绿色建筑实践。本研究采用的研究方法包括有目的地选择在尼日利亚伊莫州的建筑相关项目中参与GSCM的建筑公司。我们对一些建筑公司进行了问卷调查。通过广泛的文献回顾,确定了GSCM实施的障碍。具体而言,本研究的数据是通过相关行业从业者的问卷调查获得的。这项研究仅限于在位于尼日利亚高建筑/“尼日尔三角洲”中心的伊莫州参与与GSCM有关的活动的建筑公司。由于该研究的地理覆盖范围有限,因此本研究的结果可以外推到该国其他地区。调查结果显示,GSCM实施的障碍主要是缺乏知识和经验,这是受访者所陈述的障碍列表的首要问题。其次是缺乏最高管理层的支持、执行GSCM的费用、缺乏政府条例和支持系统等,这些都被确定为在Imo国实施GSCM的障碍。该研究的结论是建议进行更详细的分析,以便根据更好的建设项目绩效来建立GSCM从业者的能力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Barriers to Green Supply Chain Management (GSCM) Adoption on Construction Projects
: The purpose of this paper is to explore barriers to green supply chain management (GSCM) implementation in the Nigerian construction industry with a view to providing a sustainable environmental friendliness and green construction practice. The research approach deployed for this study includes targeting purposively selected construction firms that are involved in GSCM in construction related projects in Imo State, Nigeria. A questionnaire survey was deployed amongst a sample of construction firms. Barriers to GSCM implementation were identified via an extensive literature review. Specifically, data for the study was acquired via questionnaires from relevant industry practitioners. The study was limited to construction firms that are involved in GSCM related activities within Imo State which is located within the high construction /‘Niger Delta’ hub of Nigeria. With the limited nature of the study in terms of geographic coverage, the results from this study can be extrapolated to cover other parts of the country. The findings revealed that barriers to GSCM implementation were mostly lack of knowledge and experience which headed the list of barriers as stated by the respondents. This is followed in that order by lack of top management support, cost of implementing GSCM, lack of government regulations and support systems amongst others were ascertained to be obstacles to GSCM implementation in Imo State. The study concludes by recommending that a more detailed analysis be carried out with a view to building the capacity of practitioners in GSCM pursuant to better construction project performance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.80
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信