V. Rious, J. Usaola, M. Saguan, J. Glachant, P. Dessante
{"title":"评估现实欧洲电网的可用输电能力:假设对风力发电的影响","authors":"V. Rious, J. Usaola, M. Saguan, J. Glachant, P. Dessante","doi":"10.1109/INFRA.2008.5439613","DOIUrl":null,"url":null,"abstract":"This paper aims at assessing the impact of massive wind power penetration on the calculation of ATC. Calculations are made for the ATC between France and Belgium and are realized on a realistic European Electricity Network. We find that the German wind power production make this ATC vary depending on the total wind power production and its geographical distribution in Germany. Wind power production and the nodes involved in cross-border exchange must then be forecast precisely so that the cross-border exchange can be maximal without breaching network security.","PeriodicalId":207041,"journal":{"name":"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"17","resultStr":"{\"title\":\"Assessing available transfer capacity on a realistic European Network: Impact of assumptions on wind power generation\",\"authors\":\"V. Rious, J. Usaola, M. Saguan, J. Glachant, P. Dessante\",\"doi\":\"10.1109/INFRA.2008.5439613\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper aims at assessing the impact of massive wind power penetration on the calculation of ATC. Calculations are made for the ATC between France and Belgium and are realized on a realistic European Electricity Network. We find that the German wind power production make this ATC vary depending on the total wind power production and its geographical distribution in Germany. Wind power production and the nodes involved in cross-border exchange must then be forecast precisely so that the cross-border exchange can be maximal without breaching network security.\",\"PeriodicalId\":207041,\"journal\":{\"name\":\"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-11-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"17\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INFRA.2008.5439613\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INFRA.2008.5439613","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Assessing available transfer capacity on a realistic European Network: Impact of assumptions on wind power generation
This paper aims at assessing the impact of massive wind power penetration on the calculation of ATC. Calculations are made for the ATC between France and Belgium and are realized on a realistic European Electricity Network. We find that the German wind power production make this ATC vary depending on the total wind power production and its geographical distribution in Germany. Wind power production and the nodes involved in cross-border exchange must then be forecast precisely so that the cross-border exchange can be maximal without breaching network security.