竞争电力市场的风险和风险管理,CIGRE TF C5-2.02报告

S.S. Pedersen, B. Mo
{"title":"竞争电力市场的风险和风险管理,CIGRE TF C5-2.02报告","authors":"S.S. Pedersen, B. Mo","doi":"10.1109/CIGRE.2005.1532738","DOIUrl":null,"url":null,"abstract":"CIGRE Study committee C5 established a task force called risk management for world markets in 2003. This paper presents the work of the task force and in addition focuses on congestion management as an element in a risk management strategy. The paper is based on results from a survey on risk management. Congestions and outages are major uncertainties for the electric power industry together uncertainties related to the competitive electricity market. Risk management organisation and methods seems to focus on production and trading. The use of financial instruments is an element in a risk management strategy which includes congestion risks. Major uncertainties in the short and long term besides market price are regulatory risks. A challenge for the total risk management of the electricity business is to include the handling of risks related to the regulated business","PeriodicalId":414346,"journal":{"name":"International Symposium CIGRE/IEEE PES, 2005.","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-11-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Risks and risk management for competitive electricity markets, report from CIGRE TF C5-2.02\",\"authors\":\"S.S. Pedersen, B. Mo\",\"doi\":\"10.1109/CIGRE.2005.1532738\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"CIGRE Study committee C5 established a task force called risk management for world markets in 2003. This paper presents the work of the task force and in addition focuses on congestion management as an element in a risk management strategy. The paper is based on results from a survey on risk management. Congestions and outages are major uncertainties for the electric power industry together uncertainties related to the competitive electricity market. Risk management organisation and methods seems to focus on production and trading. The use of financial instruments is an element in a risk management strategy which includes congestion risks. Major uncertainties in the short and long term besides market price are regulatory risks. A challenge for the total risk management of the electricity business is to include the handling of risks related to the regulated business\",\"PeriodicalId\":414346,\"journal\":{\"name\":\"International Symposium CIGRE/IEEE PES, 2005.\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-11-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Symposium CIGRE/IEEE PES, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CIGRE.2005.1532738\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Symposium CIGRE/IEEE PES, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIGRE.2005.1532738","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

CIGRE研究委员会C5于2003年成立了一个名为全球市场风险管理的工作组。本文介绍了工作组的工作,并着重于将拥堵管理作为风险管理策略的一个要素。本文基于一项关于风险管理的调查结果。拥塞和停电是电力行业的主要不确定因素,也是与竞争激烈的电力市场相关的不确定因素。风险管理组织和方法似乎侧重于生产和贸易。金融工具的使用是风险管理策略的一个要素,其中包括拥堵风险。除市场价格外,短期和长期的主要不确定性是监管风险。电力业务的全面风险管理面临的一个挑战是如何处理与受规管业务有关的风险
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Risks and risk management for competitive electricity markets, report from CIGRE TF C5-2.02
CIGRE Study committee C5 established a task force called risk management for world markets in 2003. This paper presents the work of the task force and in addition focuses on congestion management as an element in a risk management strategy. The paper is based on results from a survey on risk management. Congestions and outages are major uncertainties for the electric power industry together uncertainties related to the competitive electricity market. Risk management organisation and methods seems to focus on production and trading. The use of financial instruments is an element in a risk management strategy which includes congestion risks. Major uncertainties in the short and long term besides market price are regulatory risks. A challenge for the total risk management of the electricity business is to include the handling of risks related to the regulated business
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信