一种评估人类行为对项目进度影响的模拟方法

A. Santolamazza, Vito Introna, V. Cesarotti, M. Benedetti
{"title":"一种评估人类行为对项目进度影响的模拟方法","authors":"A. Santolamazza, Vito Introna, V. Cesarotti, M. Benedetti","doi":"10.19255/JMPM02107","DOIUrl":null,"url":null,"abstract":"The increasing organizational complexity and competitiveness in industry is driving the interest in project management to ensure successful businesses. Uncertainty in estimating activities’ duration is one of the main criticalities of the planning phase, especially in the industrial environment, where most projects, such as the optimization or qualification of new lines, usually require the involvement of resources whose commitment is almost never bound to just one task. In this context, the impact of human behaviour if not properly considered, can lead to serious damage in terms of time and costs and these hidden risks need to be properly assessed. The present study aims to analyse and quantify the impact of human behaviours (as described by Parkinson’s Law, Student Syndrome and hidden safety) on the project in terms of delays in scheduled time though the use of a Monte Carlo simulation. The objective of the methodology is to provide the project manager with the insight required to consciously address the uncertainties of the scheduling phase in order to ensure the success of the project. In order to illustrate the methodology in a more comprehensive way, a case study regarding a project for the innovation of the production process in a real industrial plant is provided.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A simulation approach for evaluating the impact of human behaviour on project scheduling\",\"authors\":\"A. Santolamazza, Vito Introna, V. Cesarotti, M. Benedetti\",\"doi\":\"10.19255/JMPM02107\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The increasing organizational complexity and competitiveness in industry is driving the interest in project management to ensure successful businesses. Uncertainty in estimating activities’ duration is one of the main criticalities of the planning phase, especially in the industrial environment, where most projects, such as the optimization or qualification of new lines, usually require the involvement of resources whose commitment is almost never bound to just one task. In this context, the impact of human behaviour if not properly considered, can lead to serious damage in terms of time and costs and these hidden risks need to be properly assessed. The present study aims to analyse and quantify the impact of human behaviours (as described by Parkinson’s Law, Student Syndrome and hidden safety) on the project in terms of delays in scheduled time though the use of a Monte Carlo simulation. The objective of the methodology is to provide the project manager with the insight required to consciously address the uncertainties of the scheduling phase in order to ensure the success of the project. In order to illustrate the methodology in a more comprehensive way, a case study regarding a project for the innovation of the production process in a real industrial plant is provided.\",\"PeriodicalId\":320094,\"journal\":{\"name\":\"The Journal of Modern Project Management\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Journal of Modern Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.19255/JMPM02107\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Modern Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19255/JMPM02107","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

工业中日益增长的组织复杂性和竞争力正在推动对项目管理的兴趣,以确保成功的业务。估计活动持续时间的不确定性是规划阶段的主要关键之一,特别是在工业环境中,其中大多数项目,例如新生产线的优化或鉴定,通常需要资源的参与,这些资源的承诺几乎从不局限于一项任务。在这种情况下,如果不适当考虑人类行为的影响,可能在时间和成本方面造成严重损害,需要对这些隐藏的风险进行适当评估。本研究旨在通过使用蒙特卡洛模拟来分析和量化人类行为(如帕金森定律,学生综合症和隐藏安全所描述的)对项目计划时间延迟的影响。该方法的目标是为项目经理提供必要的洞察力,以有意识地解决进度阶段的不确定性,以确保项目的成功。为了以更全面的方式说明该方法,本文提供了一个关于实际工业工厂生产过程创新项目的案例研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A simulation approach for evaluating the impact of human behaviour on project scheduling
The increasing organizational complexity and competitiveness in industry is driving the interest in project management to ensure successful businesses. Uncertainty in estimating activities’ duration is one of the main criticalities of the planning phase, especially in the industrial environment, where most projects, such as the optimization or qualification of new lines, usually require the involvement of resources whose commitment is almost never bound to just one task. In this context, the impact of human behaviour if not properly considered, can lead to serious damage in terms of time and costs and these hidden risks need to be properly assessed. The present study aims to analyse and quantify the impact of human behaviours (as described by Parkinson’s Law, Student Syndrome and hidden safety) on the project in terms of delays in scheduled time though the use of a Monte Carlo simulation. The objective of the methodology is to provide the project manager with the insight required to consciously address the uncertainties of the scheduling phase in order to ensure the success of the project. In order to illustrate the methodology in a more comprehensive way, a case study regarding a project for the innovation of the production process in a real industrial plant is provided.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信