萨摩亚Afulilo大坝修订的危害评估

R. Goldsmith, K. Mccue
{"title":"萨摩亚Afulilo大坝修订的危害评估","authors":"R. Goldsmith, K. Mccue","doi":"10.1144/EGSP27.15","DOIUrl":null,"url":null,"abstract":"Abstract Afulilo Dam was built as part of a hydroelectric scheme to augment the power supply for the island of Upolu, Samoa. The 23 m high concrete gravity dam sits on the crest of a waterfall that once drained an intermontane basin. Initially, concerns were expressed about a possible active fault through the dam site linked with a larger fault across the island. This assertion was refuted but not tested by the owners, and the dam came into operation as planned. This issue was again reviewed in 2009–10 as part of an environmental and power augmentation study. The opportunity was also taken to test the compliance of the dam with accepted international practices. Additional regional geological assessments, a review of the seismic data and further drilling at the dam site provided data to improve the geological model for the dam site. It is concluded and confirmed that there is no clear evidence for the existence of such faults. If they do exist, they are not active and therefore not significant for the safety of the dam.","PeriodicalId":266864,"journal":{"name":"Engineering Geology Special Publication","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Revised hazard assessment for Afulilo Dam, Samoa\",\"authors\":\"R. Goldsmith, K. Mccue\",\"doi\":\"10.1144/EGSP27.15\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Afulilo Dam was built as part of a hydroelectric scheme to augment the power supply for the island of Upolu, Samoa. The 23 m high concrete gravity dam sits on the crest of a waterfall that once drained an intermontane basin. Initially, concerns were expressed about a possible active fault through the dam site linked with a larger fault across the island. This assertion was refuted but not tested by the owners, and the dam came into operation as planned. This issue was again reviewed in 2009–10 as part of an environmental and power augmentation study. The opportunity was also taken to test the compliance of the dam with accepted international practices. Additional regional geological assessments, a review of the seismic data and further drilling at the dam site provided data to improve the geological model for the dam site. It is concluded and confirmed that there is no clear evidence for the existence of such faults. If they do exist, they are not active and therefore not significant for the safety of the dam.\",\"PeriodicalId\":266864,\"journal\":{\"name\":\"Engineering Geology Special Publication\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Geology Special Publication\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1144/EGSP27.15\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Geology Special Publication","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1144/EGSP27.15","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

Afulilo大坝是一项水力发电计划的一部分,旨在增加萨摩亚乌波卢岛的电力供应。这座23米高的混凝土重力坝坐落在瀑布的顶部,瀑布曾经排干了山间盆地的水。最初,人们担心大坝可能会有一个活动断层,与岛上另一个更大的断层相连。这一说法遭到了业主的驳斥,但没有得到验证,大坝按计划投入运行。这个问题在2009-10年度作为环境和电力增强研究的一部分再次进行了审查。还利用这个机会检验大坝是否符合公认的国际惯例。额外的区域地质评估,对地震数据的审查和在坝址的进一步钻探提供了数据,以改进坝址的地质模型。得出结论并确认,没有明确的证据表明存在这种断层。即使它们确实存在,它们也不是活跃的,因此对大坝的安全没有意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Revised hazard assessment for Afulilo Dam, Samoa
Abstract Afulilo Dam was built as part of a hydroelectric scheme to augment the power supply for the island of Upolu, Samoa. The 23 m high concrete gravity dam sits on the crest of a waterfall that once drained an intermontane basin. Initially, concerns were expressed about a possible active fault through the dam site linked with a larger fault across the island. This assertion was refuted but not tested by the owners, and the dam came into operation as planned. This issue was again reviewed in 2009–10 as part of an environmental and power augmentation study. The opportunity was also taken to test the compliance of the dam with accepted international practices. Additional regional geological assessments, a review of the seismic data and further drilling at the dam site provided data to improve the geological model for the dam site. It is concluded and confirmed that there is no clear evidence for the existence of such faults. If they do exist, they are not active and therefore not significant for the safety of the dam.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信