{"title":"对尼日利亚电信有限公司高可靠性能源的考虑","authors":"S.B. Orokunle, J. Gropper","doi":"10.1109/INTLEC.2006.251586","DOIUrl":null,"url":null,"abstract":"Nigerian Telecommunication Ltd NITEL is the first national carrier in Nigeria, and is one of the two companies licensed to carry out the telecommunication carrier business in the country. Power generation within the company's networks has remained for decades a determining factor in the evaluation of the reliability of the services provided. Hence, discussed in this paper are the migration processes with specific real-life experience on the installed power plants towards achieving high power system availability","PeriodicalId":356699,"journal":{"name":"INTELEC 06 - Twenty-Eighth International Telecommunications Energy Conference","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Considerations For High Reliability Energy Sources For Nigeria Telecommunication Limited\",\"authors\":\"S.B. Orokunle, J. Gropper\",\"doi\":\"10.1109/INTLEC.2006.251586\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Nigerian Telecommunication Ltd NITEL is the first national carrier in Nigeria, and is one of the two companies licensed to carry out the telecommunication carrier business in the country. Power generation within the company's networks has remained for decades a determining factor in the evaluation of the reliability of the services provided. Hence, discussed in this paper are the migration processes with specific real-life experience on the installed power plants towards achieving high power system availability\",\"PeriodicalId\":356699,\"journal\":{\"name\":\"INTELEC 06 - Twenty-Eighth International Telecommunications Energy Conference\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"INTELEC 06 - Twenty-Eighth International Telecommunications Energy Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INTLEC.2006.251586\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"INTELEC 06 - Twenty-Eighth International Telecommunications Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.2006.251586","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Considerations For High Reliability Energy Sources For Nigeria Telecommunication Limited
Nigerian Telecommunication Ltd NITEL is the first national carrier in Nigeria, and is one of the two companies licensed to carry out the telecommunication carrier business in the country. Power generation within the company's networks has remained for decades a determining factor in the evaluation of the reliability of the services provided. Hence, discussed in this paper are the migration processes with specific real-life experience on the installed power plants towards achieving high power system availability