使用基于代理的方法研究制造业中小型企业对洪水的即时反应和短期恢复

M. Alharbi, G. Coates
{"title":"使用基于代理的方法研究制造业中小型企业对洪水的即时反应和短期恢复","authors":"M. Alharbi, G. Coates","doi":"10.1504/IJSPM.2019.099901","DOIUrl":null,"url":null,"abstract":"The predominance and economic significance of small and medium-sized enterprises (SMEs) means widespread disruption can have severe financial consequences for a nation. This paper presents an agent-based approach enabling simulations to investigate manufacturing SMEs' immediate response to and short-term recovery from a flood event to evaluate the effectiveness of combinations of inundation precautions. Manufacturing SME agents exhibit pre- and post-flood behaviours gleaned from interviews with such businesses that have flood experience. Based on a flood event simulated for Sheffield in the UK, results show an individual SME with most precautions implemented in the lightly or moderately flooded area can return to 100% production approximately 7 days earlier than if the least precautions were employed. Further, considering the average short-term recovery of all SMEs with most precautions implemented in the lightly or moderately flooded area, 100% production can be achieved almost 20 days before manufacturers located in the severely flooded area.","PeriodicalId":266151,"journal":{"name":"Int. J. Simul. Process. Model.","volume":"1997 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Investigating manufacturing small and medium-sized enterprises' immediate response and short-term recovery from flooding using an agent-based approach\",\"authors\":\"M. Alharbi, G. Coates\",\"doi\":\"10.1504/IJSPM.2019.099901\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The predominance and economic significance of small and medium-sized enterprises (SMEs) means widespread disruption can have severe financial consequences for a nation. This paper presents an agent-based approach enabling simulations to investigate manufacturing SMEs' immediate response to and short-term recovery from a flood event to evaluate the effectiveness of combinations of inundation precautions. Manufacturing SME agents exhibit pre- and post-flood behaviours gleaned from interviews with such businesses that have flood experience. Based on a flood event simulated for Sheffield in the UK, results show an individual SME with most precautions implemented in the lightly or moderately flooded area can return to 100% production approximately 7 days earlier than if the least precautions were employed. Further, considering the average short-term recovery of all SMEs with most precautions implemented in the lightly or moderately flooded area, 100% production can be achieved almost 20 days before manufacturers located in the severely flooded area.\",\"PeriodicalId\":266151,\"journal\":{\"name\":\"Int. J. Simul. Process. Model.\",\"volume\":\"1997 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Int. J. Simul. Process. Model.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJSPM.2019.099901\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Simul. Process. Model.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJSPM.2019.099901","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

中小企业(SMEs)的主导地位和经济意义意味着广泛的中断可能对一个国家造成严重的金融后果。本文提出了一种基于代理的方法,通过模拟调查制造业中小企业对洪水事件的即时反应和短期恢复,以评估洪水预防措施组合的有效性。制造业中小企业代理商表现出洪水前和洪水后的行为,这些行为来自对有洪水经历的企业的采访。基于对英国谢菲尔德的一次洪水事件的模拟,结果表明,在轻度或中度洪水地区实施了大多数预防措施的中小企业可以比采取最少预防措施的中小企业提前大约7天恢复100%的生产。此外,考虑到在轻度或中度淹水地区实施了大多数预防措施的所有中小企业的平均短期恢复情况,可以比位于严重淹水地区的制造商提前近20天实现100%的生产。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Investigating manufacturing small and medium-sized enterprises' immediate response and short-term recovery from flooding using an agent-based approach
The predominance and economic significance of small and medium-sized enterprises (SMEs) means widespread disruption can have severe financial consequences for a nation. This paper presents an agent-based approach enabling simulations to investigate manufacturing SMEs' immediate response to and short-term recovery from a flood event to evaluate the effectiveness of combinations of inundation precautions. Manufacturing SME agents exhibit pre- and post-flood behaviours gleaned from interviews with such businesses that have flood experience. Based on a flood event simulated for Sheffield in the UK, results show an individual SME with most precautions implemented in the lightly or moderately flooded area can return to 100% production approximately 7 days earlier than if the least precautions were employed. Further, considering the average short-term recovery of all SMEs with most precautions implemented in the lightly or moderately flooded area, 100% production can be achieved almost 20 days before manufacturers located in the severely flooded area.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信