{"title":"使用基于代理的方法研究制造业中小型企业对洪水的即时反应和短期恢复","authors":"M. Alharbi, G. Coates","doi":"10.1504/IJSPM.2019.099901","DOIUrl":null,"url":null,"abstract":"The predominance and economic significance of small and medium-sized enterprises (SMEs) means widespread disruption can have severe financial consequences for a nation. This paper presents an agent-based approach enabling simulations to investigate manufacturing SMEs' immediate response to and short-term recovery from a flood event to evaluate the effectiveness of combinations of inundation precautions. Manufacturing SME agents exhibit pre- and post-flood behaviours gleaned from interviews with such businesses that have flood experience. Based on a flood event simulated for Sheffield in the UK, results show an individual SME with most precautions implemented in the lightly or moderately flooded area can return to 100% production approximately 7 days earlier than if the least precautions were employed. Further, considering the average short-term recovery of all SMEs with most precautions implemented in the lightly or moderately flooded area, 100% production can be achieved almost 20 days before manufacturers located in the severely flooded area.","PeriodicalId":266151,"journal":{"name":"Int. J. Simul. Process. Model.","volume":"1997 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Investigating manufacturing small and medium-sized enterprises' immediate response and short-term recovery from flooding using an agent-based approach\",\"authors\":\"M. Alharbi, G. Coates\",\"doi\":\"10.1504/IJSPM.2019.099901\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The predominance and economic significance of small and medium-sized enterprises (SMEs) means widespread disruption can have severe financial consequences for a nation. This paper presents an agent-based approach enabling simulations to investigate manufacturing SMEs' immediate response to and short-term recovery from a flood event to evaluate the effectiveness of combinations of inundation precautions. Manufacturing SME agents exhibit pre- and post-flood behaviours gleaned from interviews with such businesses that have flood experience. Based on a flood event simulated for Sheffield in the UK, results show an individual SME with most precautions implemented in the lightly or moderately flooded area can return to 100% production approximately 7 days earlier than if the least precautions were employed. Further, considering the average short-term recovery of all SMEs with most precautions implemented in the lightly or moderately flooded area, 100% production can be achieved almost 20 days before manufacturers located in the severely flooded area.\",\"PeriodicalId\":266151,\"journal\":{\"name\":\"Int. J. Simul. Process. Model.\",\"volume\":\"1997 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Int. J. Simul. Process. Model.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJSPM.2019.099901\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Simul. Process. Model.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJSPM.2019.099901","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Investigating manufacturing small and medium-sized enterprises' immediate response and short-term recovery from flooding using an agent-based approach
The predominance and economic significance of small and medium-sized enterprises (SMEs) means widespread disruption can have severe financial consequences for a nation. This paper presents an agent-based approach enabling simulations to investigate manufacturing SMEs' immediate response to and short-term recovery from a flood event to evaluate the effectiveness of combinations of inundation precautions. Manufacturing SME agents exhibit pre- and post-flood behaviours gleaned from interviews with such businesses that have flood experience. Based on a flood event simulated for Sheffield in the UK, results show an individual SME with most precautions implemented in the lightly or moderately flooded area can return to 100% production approximately 7 days earlier than if the least precautions were employed. Further, considering the average short-term recovery of all SMEs with most precautions implemented in the lightly or moderately flooded area, 100% production can be achieved almost 20 days before manufacturers located in the severely flooded area.