Yuan Cao, R. Niu, Tianhua Xu, T. Tang, Jian-cheng Mu
{"title":"基于通信的城市轨道交通列车控制(CBTC)系统无线测试平台","authors":"Yuan Cao, R. Niu, Tianhua Xu, T. Tang, Jian-cheng Mu","doi":"10.1109/ICVES.2007.4456378","DOIUrl":null,"url":null,"abstract":"At present, Communication Based Train Control (CBTC) system has being researched and developed, and it is going to be the direction of development of train control system. The wireless communications system has become one of the essential subsystems of CBTC. In view of urban mass transit, this paper proposes a test platform about Wireless Local Area Network (WLAN) which has been widely applied in CBTC, and emphatically introduces two key tests: one is the AP coverage test and the other one is the SA handover test, then gives corresponding test data and results analysis. The results prove that test scheme provides the important evidences to optimize AP's arrangement along the track, realizes the uninterrupted communication between train and trackside, and ensures the safety of train operation in CBTC.","PeriodicalId":202772,"journal":{"name":"2007 IEEE International Conference on Vehicular Electronics and Safety","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":"{\"title\":\"Wireless test platform of Communication Based Train Control (CBTC) system in urban mass transit\",\"authors\":\"Yuan Cao, R. Niu, Tianhua Xu, T. Tang, Jian-cheng Mu\",\"doi\":\"10.1109/ICVES.2007.4456378\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"At present, Communication Based Train Control (CBTC) system has being researched and developed, and it is going to be the direction of development of train control system. The wireless communications system has become one of the essential subsystems of CBTC. In view of urban mass transit, this paper proposes a test platform about Wireless Local Area Network (WLAN) which has been widely applied in CBTC, and emphatically introduces two key tests: one is the AP coverage test and the other one is the SA handover test, then gives corresponding test data and results analysis. The results prove that test scheme provides the important evidences to optimize AP's arrangement along the track, realizes the uninterrupted communication between train and trackside, and ensures the safety of train operation in CBTC.\",\"PeriodicalId\":202772,\"journal\":{\"name\":\"2007 IEEE International Conference on Vehicular Electronics and Safety\",\"volume\":\"61 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"11\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 IEEE International Conference on Vehicular Electronics and Safety\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICVES.2007.4456378\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE International Conference on Vehicular Electronics and Safety","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICVES.2007.4456378","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Wireless test platform of Communication Based Train Control (CBTC) system in urban mass transit
At present, Communication Based Train Control (CBTC) system has being researched and developed, and it is going to be the direction of development of train control system. The wireless communications system has become one of the essential subsystems of CBTC. In view of urban mass transit, this paper proposes a test platform about Wireless Local Area Network (WLAN) which has been widely applied in CBTC, and emphatically introduces two key tests: one is the AP coverage test and the other one is the SA handover test, then gives corresponding test data and results analysis. The results prove that test scheme provides the important evidences to optimize AP's arrangement along the track, realizes the uninterrupted communication between train and trackside, and ensures the safety of train operation in CBTC.