{"title":"公平性和可比性——RTO输电扩展规划的指导原则","authors":"R. Chu","doi":"10.1109/PESS.2002.1043387","DOIUrl":null,"url":null,"abstract":"Summary form only given. The Eastern Interconnection is dividing into Regional Transmission Organizations. These now organizations are naming themselves independent system operators, independent transmission companies, transmission owners, stakeholders, transmission customers and etc. They take the place of the transmission operations and planning segments of integrated electrical utilities. No longer is generation planning function and transmission planning function moving hand-in-hand within a given integrated utility. Now the process has become an open process across the interconnection under the functional control of independent system operators. This presentation discusses the state of reorganization and then near and far term perceptions on how grid expansion is to be accomplished. Who will be the stakeholders, the regulators, the customers, the owners? Who will pay for the expansions? How will reliability be assured?.","PeriodicalId":117177,"journal":{"name":"IEEE Power Engineering Society Summer Meeting,","volume":"73 4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2002-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Fairness and comparability-guiding principles for RTO transmission expansion planning\",\"authors\":\"R. Chu\",\"doi\":\"10.1109/PESS.2002.1043387\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary form only given. The Eastern Interconnection is dividing into Regional Transmission Organizations. These now organizations are naming themselves independent system operators, independent transmission companies, transmission owners, stakeholders, transmission customers and etc. They take the place of the transmission operations and planning segments of integrated electrical utilities. No longer is generation planning function and transmission planning function moving hand-in-hand within a given integrated utility. Now the process has become an open process across the interconnection under the functional control of independent system operators. This presentation discusses the state of reorganization and then near and far term perceptions on how grid expansion is to be accomplished. Who will be the stakeholders, the regulators, the customers, the owners? Who will pay for the expansions? How will reliability be assured?.\",\"PeriodicalId\":117177,\"journal\":{\"name\":\"IEEE Power Engineering Society Summer Meeting,\",\"volume\":\"73 4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2002-07-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Power Engineering Society Summer Meeting,\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PESS.2002.1043387\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Power Engineering Society Summer Meeting,","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESS.2002.1043387","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

只提供摘要形式。东部互联正在分成区域传输组织。这些组织现在将自己命名为独立的系统运营商、独立的传输公司、传输所有者、利益相关者、传输客户等等。它们取代了综合电力公用事业的传输操作和规划部分。发电规划功能和输电规划功能不再在给定的综合公用事业中手拉手地移动。现在这个过程已经成为一个开放的过程,在独立系统运营商的功能控制下跨越互联。本报告讨论了重组的状态,然后讨论了如何完成网格扩展的近期和远期看法。谁将是利益相关者、监管者、客户、所有者?谁来支付资料片的费用?如何保证可靠性?
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Fairness and comparability-guiding principles for RTO transmission expansion planning
Summary form only given. The Eastern Interconnection is dividing into Regional Transmission Organizations. These now organizations are naming themselves independent system operators, independent transmission companies, transmission owners, stakeholders, transmission customers and etc. They take the place of the transmission operations and planning segments of integrated electrical utilities. No longer is generation planning function and transmission planning function moving hand-in-hand within a given integrated utility. Now the process has become an open process across the interconnection under the functional control of independent system operators. This presentation discusses the state of reorganization and then near and far term perceptions on how grid expansion is to be accomplished. Who will be the stakeholders, the regulators, the customers, the owners? Who will pay for the expansions? How will reliability be assured?.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信