基于多层Hopfield神经网络的多级配电变电站规划新算法

Yanan Cui, Suli Yan, Weixin Gao, Nan Tang
{"title":"基于多层Hopfield神经网络的多级配电变电站规划新算法","authors":"Yanan Cui, Suli Yan, Weixin Gao, Nan Tang","doi":"10.1109/ISCID.2011.37","DOIUrl":null,"url":null,"abstract":"This paper presents the mathematical model for multi-stage distribution substation planning. In order to decide the substation-planning scheme in each stage simultaneously, this work put forward a new method for getting initial feasible solution. The initial feasible solution makes load points in every stage into consideration by classifying new substations into several classes. Based on the initial feasible solution, we present Hop field neural network to calculate each substation's planning scheme in every stage simultaneously. The energy function of the neural network and calculation algorithm are given in this paper. A real multi-stage planning example is also given, and the comparison between the calculated scheme and the scheme that is done by power institution shows that the presented algorithm is effective.","PeriodicalId":294370,"journal":{"name":"International Symposium on Computational Intelligence and Design","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"New Multi-stage Distribution Substation Planning Algorithm Based on Multilayer Hopfield Neural Network\",\"authors\":\"Yanan Cui, Suli Yan, Weixin Gao, Nan Tang\",\"doi\":\"10.1109/ISCID.2011.37\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents the mathematical model for multi-stage distribution substation planning. In order to decide the substation-planning scheme in each stage simultaneously, this work put forward a new method for getting initial feasible solution. The initial feasible solution makes load points in every stage into consideration by classifying new substations into several classes. Based on the initial feasible solution, we present Hop field neural network to calculate each substation's planning scheme in every stage simultaneously. The energy function of the neural network and calculation algorithm are given in this paper. A real multi-stage planning example is also given, and the comparison between the calculated scheme and the scheme that is done by power institution shows that the presented algorithm is effective.\",\"PeriodicalId\":294370,\"journal\":{\"name\":\"International Symposium on Computational Intelligence and Design\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Symposium on Computational Intelligence and Design\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISCID.2011.37\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Symposium on Computational Intelligence and Design","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISCID.2011.37","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文章由计算机程序翻译,如有差异,请以英文原文为准。
New Multi-stage Distribution Substation Planning Algorithm Based on Multilayer Hopfield Neural Network
This paper presents the mathematical model for multi-stage distribution substation planning. In order to decide the substation-planning scheme in each stage simultaneously, this work put forward a new method for getting initial feasible solution. The initial feasible solution makes load points in every stage into consideration by classifying new substations into several classes. Based on the initial feasible solution, we present Hop field neural network to calculate each substation's planning scheme in every stage simultaneously. The energy function of the neural network and calculation algorithm are given in this paper. A real multi-stage planning example is also given, and the comparison between the calculated scheme and the scheme that is done by power institution shows that the presented algorithm is effective.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信